My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-1986 Council Packet
Orono
>
City Council
>
1986
>
08-11-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 12:40:23 PM
Creation date
1/9/2026 12:37:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The following list of final submittals must be submitted to the <br />Zoning Administrator two weeks prior to the regularly scheduled Council <br />meeting on the second and fourth Mondays of the month: <br />Final Submittals <br />1. RECORD PLAT drawings in the form of two (2) mylar copies and one (1) <br />additional copy reduced to 1"-200'. Drawing to include: <br />a) lot lines platted per preliminary survey; <br />b) dedication of "drainage and utility easements" 10' wide along all <br />perimeter property lines and 5' each side of internal property lines, <br />except omit at lakeshore; <br />c) wetland areas to be designated as drainage easements on the plat <br />and to be described in angles and bearings. <br />2. LEGAL DOCUMENTS required: <br />a) Title opinion addressed to the City. All owners, mortgage holders <br />or others with property interest indicated therein shall sign the plat <br />and all other documents affected by such interest; <br />b) The applicant must provide certified copies of all recorded <br />easements currently affecting the property; <br />c) Excecuted Conservation 6 Flowage Easement, Road 6 Utility <br />Easement, permanent covenants for upkeep of road. <br />3. FEES TO BE PAID: Total Due $1,150.00 <br />A. Park Dedication Fees per current schedule, calculated as follows: <br />$200.00 per each newly created lot at $400.00 <br />B. Engineering review and inspection fees per current schedule: <br />at $600.00 <br />C. Final plat fee: $150.00 <br />Adopted by the Orono City Council on this llth Day of August, <br />1986 <br />ATTEST: <br />Dorothy M. Hallin, City Clerk Mary C. Butler, Mayor <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.