Laserfiche WebLink
� <br /> � <br /> , <br /> i <br /> Clt� o� ORONO <br /> ! d . <br /> � RESOLUTION OF THE CITY COUNCIL ., <br /> � NO. ��3 7 <br /> • - • • <br /> CONSTRUCTION PERMITS AND INSPECTION FEES (CONT) <br /> ' Applicable <br /> Permit Tyne Fee Code Section <br /> MUNICIPAL CONNECTION PERMIT � <br /> Sewer . $ 20 . 00 25 .321 <br /> Water $ 20 . 00. 25A. 020 <br /> 5/8" meter $ 75 . 00 25A. 310 <br /> 3/4" meter $ 95 . 00 25A. 310 <br /> larger meter uote bas.is 25A. 310 <br /> Mai1-in postage & handling charge $� 1. 00 . � <br /> ON-SITE SYSTEMS � 22 .300 (Ord. 210 <br /> Design Review Fees Included with permit fees <br /> Subdivision Site Evaluation Report Review $ 30 . 00/new lot <br /> • � (maximum) $ 150. 00/subdivision <br /> Std. Residential System Permit $ 35 . 00 <br /> (new or replacement) <br /> Innovative Residential System Permit � $ 50 . 00 <br /> (new or replacement) <br /> Non-Residential System Permit $ 100 . 00 <br /> (new or replacement) <br /> Existing System Repairs/Drainfie7.d Addition $ 20 . 00 . <br /> (but not complete replacement) <br /> Annual Service Charge $ 20 . 00/system/year <br /> � plus 10% late pena7.ty for <br /> , unpaid charges certified <br /> INDIVIDUAL WELLS 23.050 (Ord. 221 <br /> Installation Permit � $ 20 . 00 <br /> GR.ADING, EXCAVATION, FILLING 31. 705 & 31.871. <br /> 50 cubic yards or less (5 loads) $ 30 .00 . (staff permit) <br /> 51-100 cubic yards (max. 10 loads) $ 50 .00 .(staff permit) <br /> 101 cubic yards or more $ 7.00 . 00 f Cond. Use Permit <br /> NOTE: 101 cubic yards or more requires a Conditiona7. Use Permit unless <br /> approved as part o� a building permit. <br /> � . <br /> � -. PAGE 8 of .14 <br />