Laserfiche WebLink
. ' <br /> ' � <br /> . j <br /> I <br /> , { <br /> . Ci.ty o� ORONO ' <br /> � d <br /> � RESOLUTION OF THE CITY COUNCIL . <br /> � No. /�/�3 7 <br /> • - • • . <br /> CONSTRUCTION PERMITS AND INSPECTION FEES ' <br /> . Applicable <br /> . Permit Type Fee Code Section <br /> BUILDING FERMIT 20 .040 (Ord. 216 <br /> Minimum Fee $ 20 .00 <br /> Normal Fee (per 1979 UBC/SBC Standard Schedule) <br /> P1an Review Fee (per 1979 UBC/SBC Standard Schedule) <br /> DEMOLITION PERMIT 20 . 040 (Ord. 216 <br /> Principal Use $ 20 . 00 <br /> Accessory Use $ 10 . 00 <br /> PLUMBING PERMIT $ 4 .00/f ixture 21 . 050 <br /> $ 20. 00 minimum/project <br /> • Mail-in postage & handling charge $ 1.00 <br /> MECHANICAL PERMIT 20 .040 (Ord. 216 <br /> Minimum Fee for any Mechanical Permit $ 20 . 00 per project <br /> Mail-in postage & handling charge $ 1 . 00 <br /> Residential, Single Family & Duplex bv Unit Tvpe ' <br /> - furnace or boiler with flue $ 15 . 00 each unit <br /> �- wood stove with flue $ 15 . 00 each unit <br /> - wood combination or add-on unit $ 30 , 00 each unit <br /> - factory fireplace with flue • $ 15 . 00 each unit <br /> - central air conditioning $ 15 . 00 each unit � <br /> - exhaust fans (bath, kitchen, attic, etc) $ 5 .00 each location <br /> - solar space heating equipment $ 50 . 00 each system <br /> - solar water heaters $ 15 . 00 each unit <br /> � - repairs and replacement of the above Minimum Fee <br /> Commercial , Industrial and MuTti-Famil.y 'Residential bv Unit Ty�• <br /> . - residential type equipment per schedule above <br /> - furnace, boilers, unit heaters , and <br /> makeup air units $ 2 . 00 per 10 ,000 btuh outnu <br /> - central air conditionin� $ 'S . 00 per ton AC <br /> - exhaust fans $ 10 .00 each <br /> � - refrigeration � $ 20 . 00 per compressor <br /> � - fixed equipment with steam, hydraulic <br /> - �r comp. air system $ 2 . 00 .per connection <br /> - fire sprinkler systems a) residential $ 20 . 00 each project <br /> b) commercial, . $ 20 . 00 plan review plus <br /> permit fee of $2 .00/head <br /> minimum $20 . 00/project - <br /> PAGE 7 of 14 maximum $100 . 00/project <br />