My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-1986 Council Packet
Orono
>
City Council
>
1986
>
07-14-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 2:03:15 PM
Creation date
1/6/2026 1:54:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPEND.. A - GREEMENT FOR <br />BUILDING INSPECTION SERVICES BETWEEN <br />ORONO AND WAYZATA. <br />The follow: y appendix outlines both the phases for this <br />contract arA. terms for each phase. While it is anticipated that this <br />cont -act w ? 11 last apprc, -te l y one (1) year nothing writ .:en here <br />shall prohibit its continuation by mutual agreement of the parties. <br />1. PHASING - Phase I of the contract will last approximately six <br />(6) months during which time the individlial from the C _,/ of <br />e'ayzata, w.,o is currently certified at Level 1, will be w„rking <br />to upgrade his certification. Phase 2 wi.l' be after some upgrade <br />in his educational credentials together with additional <br />experience on the job and will last approximately three (3) <br />months. Phase 3 which will also last three (3) months w 11 be <br />alter the Wayzata Inspector has reached c. Afication Level 2 in <br />which he can become a qualified BuildinL A cial <br />2. PLAN REVIEWS - Under the Wayzata fee schedule thr chard, <br />elan review fee ; ; 65% of the building inspection . -3 fo'. <br />�onstruccion i s i or. their currently- adopted 1985-8t ices. <br />is agreed that ring Phase 1 ff resideni-4.a1 and during all <br />Ph ses for comrr Aal that Orono k :1 charge for its plan review <br />servi,vs 50% of the building inspe on fees leaving Wayzata 15% <br />for ar.y attendent Zoning Administr review. For residential <br />rc:vi fn- during Phase 2 Wayzata an o ill evenly split that <br />5u$ 25t going to each commun.L y. g Phase 3 Wa �-a <br />will bP solely responsible for residentir. iews and thei_rore <br />will rtceive the entire 50*. <br />For all Flans requiring stri not withstanding the <br />phasing the entire 50% wi' ..o and the City will <br />contract with the firm of B;•- 3-D the structural review <br />arA will responsible fo- ! :.L fees. <br />3. BUILDING TNSr"717TION k = !I cbnrae building <br />ins, V-tion r Gi ,p'2� 0.00 pe This i, udes : - uuilding, <br />str: cl-ura 1, iu.�.^hanica 1 and p_ __inoiiig. The time sta:...a whenever <br />the Inst `or crosses the border into Wayzata and wiiI continuo- <br />*.il sucn time a� they cross out of Wayzata excluding any bre^ks <br />tn. Inspector ma ake or ai.,• ti spent In the community for <br />office hours or An re•views. Orono is responsible for all <br />mileage -nd feer for the Inspector. While these fees are charged <br />�•1 a h, ty race and therefore the Phasing is not as critical, <br />.c fol:•winc Phasing is anticipa`-d :� the in;pections: <br />Phase Duri, this phas ro.io h 1.1 ve respc, a� a for <br />0::-iing the ins. ctirns or oersee.,..,g those done . y the <br />Wayzata insp(,c--)r. Commercial rill be d,.:ne strictly by <br />Or%no. <br />
The URL can be used to link to this page
Your browser does not support the video tag.