Laserfiche WebLink
f. Evergreen Buffer: Consistent with Mrs. Hoppe's will the area <br />east of the parking lot to the boundary of the park will be <br />planted with evergreens to buffer the neighbor to the east. <br />The mass of plantings will also include other plant materials <br />to add color and texture of interest. <br />g. Memorial Arbor: The existing arbor should be removed and <br />replaced with one replicating the architectural style of the <br />house. Specifically, the memorial arbor should recall the <br />feeling of the porch and utilize the pillars salvaged when <br />the house was razed. <br />h. Gazebo: The boathouse/gazebo is being restored in 1985. The <br />top story will be a pleasant place to rest with panoramic <br />views of the Lake, formal garden, and the remainder of the <br />Estate. <br />i. Maintenance Services: A small work area and storage space is <br />provided as part of the visitor center building. The storage <br />of most maintenance equipment and large materials and <br />supplies will be 4n the main barn across County Road 51. <br />J. Irrigation System: The water distribution system will <br />require some improven as the existing system is antiquated <br />and a maintenance pry em.. <br />3. Capital Funding <br />Capital funding for the development of the Estate Garden will come <br />from several sources. Earnings from the funds given by Mrs. Hoppe <br />in excess of annual operating costs as well as principal in excess <br />of $1.2 M will be used for development projects. in addition, the <br />District will seek contributions from individuals, organizations, <br />Ib <br />