My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-1986 Council Packet
Orono
>
City Council
>
1986
>
04-14-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 11:42:36 AM
Creation date
12/29/2025 11:29:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3) Dedication of a 30' corridor along the southern boundary of <br />Lot 2 for right-of-way for Highview Lane (this will require <br />revisions of the old final plat drawings). <br />4) Dedication of a 40' corridor for right-of-way for County <br />Road No.151. <br />5) Dedication of wetlands per the aforementioned final plat <br />drawing, denoted on the mylar as "Drainage Easement". <br />B. LBGlAL DOCUMENTS required: <br />1) Title opinion addressed to the City. All owners, mortgage <br />holders or others with property interest indicated therein <br />shall sign the plat and all other documents affected by such <br />interest. <br />2) The applicant must provide certified copies of all recorded <br />easements currently affecting the property. <br />3) Executed Conservation and Flowage Easement; legal <br />description to be filled out as follows: "as shown as the <br />drainage easement appearing on the plat of (Plat name), Hennepin <br />County, Minnesota". <br />4) Executed Road and Utilities Easement to be granted to the <br />City over the 495' long, 25' wide access corridor <br />portion of Lot 2; your surveyor should determine the proper legal <br />description for this. <br />5) Draft of private access easer.,ent over Lot 2 in favor of Lot <br />1. <br />C. FMS TO BB PAID: Total Due $250.00 <br />1) Park dedication fees per current schedule, calculated as <br />follows: 1 new lot at 5+ acres - $100.00. <br />2) Legal and Administrative review fees per current schedule: <br />$150.CO. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.