Laserfiche WebLink
Zoning File #1010 <br />April 10, 1986 <br />Page 2 of 3 <br />Site Plan Review - <br />a) Setbacks <br />Required Proposed <br />Front 35' 35' <br />Side 15' 15' <br />Rear, 35' 80' <br />The paved area setback from the newly defined retention area (932 <br />elevation) is approximately 22 Note this is not a designated <br />wetland and the 26 feet setback stan-lard does not apply. Silt fencing <br />and hay bales will be placed ;.long the edge of the retention area/ <br />drainageway prior to construction or gradincj. <br />b) Parking (Section 10.61 Subdivis:)n 10(Q)) <br />Sales area 80' x 63' r 5040 s.t. <br />1 space per 5040 - 500 = 4540 -- 500 = 9 spaces <br />9 spaces provided <br />c) Henrepin County Highway D._.pt. <br />Access has been approved - County has asked that access location <br />be lined up with Dunwoody access at Shoreline Dr. In addition, <br />the County asked that Katainen provide a turnaround for trucks on <br />site - this has also been provided. <br />d) Drainage <br />The irai.nage plans have been approved by Glern Cook and the <br />M.C.W.D.. In the conservation district letter ((_xhibit D) thev <br />direct the applicant to seek written permission to construct a <br />baffle weir on the County property. I have b?en advised by <br />applicant's engirâ–ºeer that the County has refuf.ed try request <br />finding similarly constructed weirs to freeze creating more se- <br />vere problems. <br />Katainen's plans p,ovide for a retention area that will compensate for <br />the additional runoff cleated by the proposed hardcover and any fill <br />placed below the 934 elevation. <br />*Total ponding area - 25,600 square feet <br />Proposed ponding area on site = 5,700 square feet <br />*Area includes portions of garage and County properties to west in <br />Orono and small residential neighborhood in Spring Park. <br />Spring Park has been advised of the project and their staff has <br />reviewed the drainage plans. They have ne concern as long as <br />additional surface runoff created by the improvement is provided for <br />on site. <br />