Laserfiche WebLink
SITE DEVELOPMENT <br />The site devel- lent plan shown on the following drawing indicates general site <br />improvements described in the previous section. <br />The "grand mall" has been strengthened and given further definition by locating staff <br />housing along one side and a motel -type housing building along the other. Staff housing <br />has been located here to centralize supervision, to provide accessibility to staff <br />personnel and to guarantee better camp security. With adequate winterization, the <br />handicapped -accessible, motel -type hr- ing building which will be described later, <br />together with the dining hall and staff housing, could provide the ibility to operate a <br />winter program on the Island with centralized facilities and a minimal amount of snow <br />rerticv a l . <br />Eleven new cabin clusters, which will be described later, have been located on bluffs to <br />maximize views and access to prevailing bree as. The cabin clusters have been grouped, <br />such that too or three buildings could share water and power lines and a septic tank <br />system, and to provide distinct cabin communities. <br />A tent camping area is located on the side of a bluff along the eastern side of the <br />Island. The 25 sites would each have a level platform for erecting a tent, a picnic table <br />and a f i rep i t. A separate toilet and shower building is provided for the camping area, <br />and four sepa ate water and trash collection stations would be provided. <br />A trail system is shown as a dotted line around the perimeter of the Island, 'As well as <br />developed nature trails in the two different marshy areas. <br />