My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
88-1277, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 1:06:34 PM
Creation date
12/23/2025 1:00:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veteran's Camp <br />February 24, 1988 <br />Page 2 of 2 <br />2. Water supply - Main contact person for the City of Crono is Mike <br />Gaffron. Roger Carlson to inspect private water supply for new camp <br />use. City may consider asking outside professional opinion if <br />applicant wishes to use existing water supply. Map of water <br />mains/lines to serve entire island facility must be submitted with the <br />formal application.. <br />tions left after burn - sites to be inspected and <br />requ red grad nq ompleted prior to opening facility to public use. <br />Staff person in charge is Tom Jacobs. <br />4. Prior to opening facility to the public, boat house/guard house to <br />is removed/burned and appropriate method of storing boats and <br />equipment to be reviewedwl+4. Iropms/ p"hca,7��•�v, <br />5. pining hall - if structure's use is not resolved by the time the <br />facility is opened to the public, spe:,ific structural <br />alterations/modifications will be required. Main contact person is <br />Tom Jacobs. <br />6. All structures to remain must meet Building Code standards - main <br />contact person is Tom Jacobs. <br />7. Caretaker cabin to be defined and additional information regarding <br />the duration of employment. Specify iF new cabins are to be <br />contracted for the 1988 season.. L •c&Yr ow O/M, <br />8. Trail area and/or system of trails. <br />9. With the formal application, the site plan of the new recreation <br />and camping area must define the following: <br />a) Tenting locations (each camp site should be defined to scale <br />on plan), areas used Wthe day use recreation, location of <br />cabins to remain, new cabins to be construction, location of <br />lavatories and shower area-, location of picnic areas and the <br />sheltered cooking areas. <br />10'. If there is an expansion of the original joint use dock <br />application, new multiple docks must be approved with the appropriate <br />licensing and there locatic,n on the shoreline and their design plan <br />should be submitted. <br />11. If a subdivision is planned by applicants, Mr. Wisdorf should be <br />advised that this could take anywhere from 3 to 4 months and he should <br />be notified that this area will be excluded from the camp use density <br />credit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.