My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
88-1277, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 1:06:34 PM
Creation date
12/23/2025 1:00:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 - Big Island Veterans Camp <br />General Land Use Application <br />needed aft r. opening. An extensive beaching area is also <br />available co the west of the site of the Present dock. <br />1. Boat storage of camp boats during the summer months will be in <br />permanent slips, or in case of fishing boats, beached west of <br />the existing dock site. Winter storage will be dry stacking <br />near the beach with larger boats, such as the pontoon, beached <br />at the dock area. <br />j. Proposed overnight camping density for workers accomplishing <br />activities is fifty-seven (57). Proposed .ansity for day <br />camping during 1988 is one hundred fifty (150) with one hundred <br />(100) allowed for overnight tent camping. Events involving <br />large numbers of attendees (eg. 500) would be subject tr a <br />separate request for an event permit. <br />k. A license will be required to allow for sale of soft drinks <br />and other like packaged goods by the caretaker. <br />S f. Site Plan Narrative <br />Cleanup and renovation activities will cover most of the Island, <br />however, near -term day and tent camping will be focused on the <br />Point Charming area. Renovation and refurbishment of existing <br />latrines at Point Charming and the Peanut Row area are a key <br />priority. <br />a. Tent areas of approved design and layout will be established <br />at Point Charming. <br />b. The beach area utilized for Point Charming would be the beach <br />directly east of Point Charming. <br />c. The overnight cabin accomodation in this phase will be the <br />caretaker's cabin. <br />d. Picnic and cooking activities will be centralized at Point <br />Charming in this phase. <br />e. Docks will be constructed in the current location subject to <br />Orono and CMCD approval. <br />f. No specific formal recreational areas will be designated in <br />this phase. <br />g. Latrines at Point Charming and Peanut 'ow will be renovated <br />serially with a minimum of one required to be operational for <br />camp opening. <br />16 V. Future Plans <br />The overall objectives of the Camp is to renovate for permanent <br />retention the following buildings: <br />
The URL can be used to link to this page
Your browser does not support the video tag.