My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
88-1277, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 1:06:34 PM
Creation date
12/23/2025 1:00:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 - Big Island Veterans Camp <br />General Land Use Application <br />e. Approval of water supply systems for use by campers and workers. <br />f. Siting of picnic tables, grills, benches avid other camp <br />furnishings at Point Charming. <br />g. Continuation of brush cleaning required for establishing tent <br />camp sites. <br />h. Construction of approved dock capable of supporting camp and <br />transient use. <br />i. Establishment of a helicopter landing area for use by camp and <br />emergency response personnel. <br />j. Establishment of a fenced garbage consolidation area. <br />k. Securing to the satisfaction of Orono staff any building <br />or other areas considered hazardous. <br />1. Development of a new renovation requirements baseline plan for <br />the remaining buildings after re -inspection by Orono staff. <br />T k. Other Relevant issues and Needs <br />a. Worker tent camping to begin immediately with a maximum of <br />fifty-seven (57), one (1) per acre. <br />b. Adequate fire protection and fire extinguishers will be <br />provide:: f-ir overnight campers and during bairn activities. <br />c. New constructionâ–ş and burn permits will be separately secured <br />from Orono. <br />d. The camp manager is Mark Peterson, who began his duties on <br />April 1, 1988. Mr. Peterson has had years of experience in <br />camp operations and will prove to tie an excellent resource <br />for ensuring plan goals are met. He can be reached at 474- <br />1958. Mr. Peterson is chartered to supervise work crews and <br />contractors as well as scheduling and coordination of activi- <br />ties. His presence on the island will also ease coordination <br />and inspection responsiveness. <br />e. All buildings will remain secured until approval is gained for <br />their use. <br />f. Septic, latrine and water supply elements will require <br />inspection, renovation and approval by Orono and State <br />inspectors. <br />g. A current .:ertificate of insurance will be provided. <br />h. Two permanent slips will be required for use by camp -owned <br />boats prior to camp re. ,>ening. Approval for six permanent <br />slips for camp use and up to twenty transient slips will be <br />
The URL can be used to link to this page
Your browser does not support the video tag.