My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
90-1518, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 12:49:16 PM
Creation date
12/23/2025 12:47:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background <br />The Big Island Veterans Camp was re -opened for day camping in July, 1988, <br />after a period of clean-up and renovation. A number of the Camp buildings <br />had fallen into disrepair and 32 of the 43 buildings on the Camp property <br />were razed in 1988. The eleven ►•emaining buildings were either renovated, <br />secured or converted to storage use prior to Camp opening in July, 1988. <br />In 1989, 2 new picnic shelters were erected - one of which includes toilet/ <br />shower facilities. <br />Objective <br />This document sets forth the planned renovation of existing buildings and <br />facilities as well as the construction of new buildings and facilities. The <br />strategy throughout our planning activities has been to integrate the follow- <br />ing characteristics: <br />1. Project Approach <br />Each of the projects set forth in the plan is of a defined scope and <br />will be initiated separately. While multiple projects may be under <br />way at a given point in time and may support or rely on each other, <br />the focus on approved projects will ensure their timely completion. <br />2. Incremental Funding <br />As funding is made available to initiate a given project, application <br />for its initiation will be made to Orono. This attribute also allows <br />us to foes on current project completion before initiating other un- <br />funded projects. <br />3. Project _Priority <br />Projects are arranged in priority in order to support the planned <br />evolution of Camp operations. <br />4. Flexibility <br />This plan represents our best plan for renovation and reconstruction. <br />Some level of flexibility in priority and projects will be required <br />but will be kept to a minimum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.