My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
90-1518, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 12:49:16 PM
Creation date
12/23/2025 12:47:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1518 <br />April 12, 1990 <br />Page 2 of 5 <br />F) Additional requirements: <br />1. smoke detectors for bedroom area; <br />2. each cabin supplied with approved fire <br />extinguisher labeled for Class A, R and C hazards <br />and minimum extinguisher size shall he 1A10AC. <br />List of Bxhibits <br />Exhibit A <br />Exhibit B <br />Exhibit Cl <br />Exhibit D <br />Exhibit E <br />Exhibit F <br />Exhibit G <br />Exhibit H <br />Exhibit I <br />Exhibit J - <br />Exh'bit K - <br />Exhibit L - <br />Exhibit M - <br />Exhibit N - <br />Exhibit 0 - <br />Exhibit P - <br />Exhibit Q - <br />Exhibit R - <br />Application <br />Property Owners List <br />Plat Map <br />Before/After Hardcover Fart Sheets <br />List of Board of Governor+ 1990 <br />Map/Site Plan Big Island <br />Renovation/Reconstruction PIan Revised 2/28/90 <br />Copies of 1989-1990 State License to Operate <br />Camp ^,rounds <br />Resolution #2613 Conditional Ilse Permit <br />Overnight Camping <br />Site Plan - Southeast Area - Cabin Site <br />Board of Govenors - Financial Statement <br />Elevations - Optional Cabin Designs <br />Cabin A - Detail Elevations <br />Typical Floor Plan - Cabin A <br />Alternate Floor Plan - Cabin A <br />North Medical Transporation Services - <br />1990 Update Letter <br />Liabil+r_y Insurance 1990 Season <br />Campq — and Emergency Preparedness Plan <br />Review of Current Level of Operation and Improvestents - <br />fcr <br />Plan <br />The existing drainfields within the southeast area and <br />peanut row in the northeast areaare satisfactory, the picnic <br />shelter within picnic dock area has been completed and per <br />staff's recent inspections, the septic system is near completion <br />to serve the bathrootr area within the picnic shelter structure. <br />The camp proceeded with •`- 1989 season at a medium successful <br />level. The septic systems appeared to serve visitors to camp. <br />There are apparently no problems with existing septic systems as <br />reported by inspection staff during last season. <br />
The URL can be used to link to this page
Your browser does not support the video tag.