Laserfiche WebLink
DAVID NI T2 <br />LOT 7, BLOCK 1 <br />FARVIEW <br />Percolation Results <br />Hole No. Material Percolation Rate <br />P-7 Black Loam 48.0 Min./inch <br />P-8 Black Loam 24.0 r <br />The average percolation rate is 36.0 minutes per inch. <br />Soil Boring <br />S_2 B,Yf 1 <br />RIP th(ft. ) Material <br />0.0-0.3 Dark Brown Sandy Loam <br />0.3-0,6 Brown Slack Loan <br />0.6-4.0 Black Loam <br />4.0-60 dray Black Clay Loam <br />Mottled soil existed at 4.0 feet and water <br />was observed at 4.2 feet after 24 hours. <br />