Laserfiche WebLink
ADDITIONAL SITE EVALUATION <br />INFORFATION FOH DAVID NITZ <br />LOT 7, bLOCK 1 FARVIEW <br />11-13-79 <br />On November 10, 1979 two additional percolation holes were tes- <br />ted and one additional soil boring taken. This was done because the <br />original primary site will be taken up by the new house location. <br />The original alternate site would be the location of the proposed <br />primary system. This newly tested area would become the alternate <br />site. <br />This new area meets the basic requirements for a shallow trench <br />system. However, as was the case on the two previously tested sites, <br />the water running down the side slope will have to be diverted from <br />J <br />the drainfield area. An interceptor drain will be needed for this <br />purpose. It may be possible to utilize a drain around the house for <br />this purpoes as long as it would be deep enough. <br />If any additional information is needed, please oontact me. <br />Sincerely, <br />PRRCOR, INC. <br />Ado <br />/Mark S. Qronberg, P.S. <br />