My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1985 Council Packet
Orono
>
City Council
>
1985
>
12-09-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:37:37 AM
Creation date
12/12/2025 11:27:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITYof ORONO <br />Pont Office Box WeCrystal Hay, Minnetote 4fi3 le'tunicipal ChTu . <br />On the North Shore of Lake Minnetonka <br />December 5, 1935 <br />Mr. Glenn Cook <br />Bonestroo, Rosene <br />2335 W. Trunk Hwy 30 <br />St. Paul, MN 55U3 <br />Re: MWCC Project 86-51/Orono Int.:L::eptor Improvements <br />Dear. Glenn, <br />Having reviewed tht. r►tent of the project referenced above <br />together with your proposal the selection of Bonestroo <br />as the engineer on the project would be of benefit to Orono in <br />many ways, as it would bring to bear your experience with the <br />Orono system together with the d sires and needs of Orono for <br />improvements including the propo; ed telemetry system. <br />There is however, 7 areas of concern, in that the <br />improvements may entail t�.-- replacement of existing forcemain <br />piping, which was originally put in as part of the original Orono <br />sewer system. Being fully cognizant of the fact that there are <br />times that t:he system has overflowed causing sewage to flow hoth <br />into basements and also raw sewage into Lake Minnetonka, there is <br />very possibly the need beyond lift station improvements to handle <br />the current capacity in the lines. while it may be appropriat,) <br />that the size of the pipe could or should be changed, I do see a <br />potential conflict in two regards as they relate to Bonestroo <br />being both City Engineer and also the selected Engineer on behalf <br />of MWCC for those improvements. They are as follows: <br />a. To the extent that tt•ere is needed a decision or <br />recommendation regarding replacement of the pipe that <br />the interests of Orono and MWCC may be in conf l-Ict as to <br />whether changes in lift stations and telemetry would <br />alleviate the problem at a lesser cost than actual <br />replacement of the pipe or if both are needed in order <br />to accomplish alleviation of existing ablems. <br />t>. To the extent a recommendation needs to L.e made <br />regarding the sizing of the pipe there could be a <br />difference as to the size based on the iiv(,rgent goals <br />between MWCC, and Orono. <br />M'ti.UtNt ! /ONINr 4717.1.17 • ADMINtSTRATIUN B I I\AWT - 473-715A • PUBLW WORKS - 173-7159 <br />ASSE.SSI M, <br />
The URL can be used to link to this page
Your browser does not support the video tag.