My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1985 Council Packet
Orono
>
City Council
>
1985
>
12-09-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:37:37 AM
Creation date
12/12/2025 11:27:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H.7 HiAh_ Water Conditions on t;innet,at►a (:reek <br />When hlt;h water conditions art reported or vrtdieted on <br />Minnehaha Creek, thu Lngincer ror tl►e District shall proms tly <br />Investigate the r,:ported or Nradicted <br />and determine whet►ier adjustrient can L <br />throueh the control structure thus wou <br />water condition. If' adjustments can L <br />cc rrslatent wits, the MANAGLMLN'T POLICY, <br />prornptl,y make such adjustments as are <br />high water condition <br />e made in the discharges <br />ld reduce the high <br />e made that are <br />the Ln6ineer shall <br />appropriate to reduce <br />downstream hit,h water conditions as soon as possible. <br />(Paragraph B.7 adopted September, 19bO). <br />b.8 Operational Responsibility <br />'lhe District may enter into a contract with another <br />governmental agency to provide operatine personnel. <br />Lmployees of the contractlnb agency will handle minor <br />maintenance and repairs when required and will make reauiar <br />trips to the site as directed by the District's Er-ioineer. <br />The contrul structure shall be operated by the District <br />In accordance wit`, the limitations set forth in the <br />headwaters Control Structure Management Policy and Operating <br />Procedures, and Minnesota 1)NH Permit No, 76-6240. <br />B. 9 Monthl3 Summa y Da t o <br />Uuriri6 the open water season tt►e District's gr4,ineer <br />shall prepare a monthly summa^y oi' all data rf_icelved and <br />analyzed by his of'f'ice, 1nclidir4., aijustments made in the <br />discharge rate during the prior month. This summary shall be <br />distributed to the Manar,ers , the Minnesota Department of <br />Natural Resources, the creeksidc: end lakeside municil,alities, <br />the Board of County Commissioners of Hennepin and Carver <br />Counties and shall be available to interested peruons. <br />:;LCT10N IV. Tl_.hMy OF AND AMENDMENTS TO 'THE MANAGEMLN'l POLICY <br />AND OPERATING PROCEDURES <br />1. T e err► <br />This document dei'lnes the Management Policy anA <br />Oleratirrg Procedures for the Headwater's Control Structure at <br />Gray's Bay f'or the period March 1, 19b3 and thereafter. Anv <br />amendments to this document shall br made pursuant tc Stctinn <br />1V.2 below. <br />rieview of Manei&e►,,ent _Polio+ and Ulerdtink%_Procedures <br />On or before .,anuary 1, 19bL, the District ahn.l submit <br />to the Minnesota Lepartment of Natural Resources any <br />amendments to U.e existinb Management Policy and Upernti% <br />Procedures deem,-d neceseary by the: District for thc: three (i ) <br />yee►r }period comme.ncinL March 1, 19d6. Thirty (30) trays prior <br />9 of 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.