Laserfiche WebLink
CHAW'E'. ORDER <br />DATE: November 4, 1985 <br />PLACE: Orono, Minnesota <br />PROJECT: Sanitary Sewer Improvements Crystal Bay FILE NO.: 13918 <br />PROJECT N0: 13918 <br />CONTRACTOR: A.R.I. Contracting, InC.,P.O. Box 706, Eveleth, Mn. 55734 <br />CHANGE ORDER NO: 5 <br />Change Order Item <br />PANT A: <br />Eat'd Total <br />Unit Price Quantity Amount <br />Extension of time for placemenL of bituminous hase course front December 15, 1985 to June <br />15, 1986. <br />Fxtensioll -f 1 imte 01111 <br />'fatal Part A - Extension in Time Only...., <br />PART B: <br />Nurniali and install a 3 phase 480 volt to 240 volt transformer. Connect transformer <br />between auxilary power receptacle and manual, transfer switch. Transformer to change 240 <br />volt generator output to 480 volt 'or pump operation. <br />Transformer to be 45 KVA, with 2-1-1/21 tapa above and 2-1-1/2% taps below normal. <br />Ttansformer to be Sorgel No. 45 TGH or equal with 480 volt delta to 240 volt delta with <br />three. windings. Transformer to have weatherproof enclosure. Provide mounting brackets and <br />mount transformer to back panel. Paint transformer and brackets to match control panel. <br />Lift Station Transformer <br />I.S. $3,622.50 <br />Total hart B - ADD..... <br />Total Part A -- EXrF.NSION IN T14E ONLY $0.00 <br />Total Part B - ADD 3,622.50 <br />TOTAL THIS CHANGE ORDER NO. $3,622.50 <br />Original Contract A,,v.iunt $u91,587.65 <br />Previous Change Orders 15,019.00 <br />THIS CHANCE ORDER NO. 5 - ADD) 3,622.50 <br />REVISED CONTRACT AMOUNT........ $710,229.15 <br />Page 1 . <br />1?62d <br />L.S. $3,622.50 <br />$3,622.50 <br />