My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1985 Council Packet
Orono
>
City Council
>
1985
>
12-09-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:37:37 AM
Creation date
12/12/2025 11:27:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2331 W. 9.a.,.k 36 <br />&. A..d. M.......& 4511d <br />/fib«.. 61.2 - 636-4600 <br />December 5, 1985 <br />City of Orono <br />Box 66 <br />Crystal Bay, MN 55323 <br />Attn: Mr. John Gerhardson <br />Re: Our File No. 13918 <br />Crystal Bay Sanitary Sewer Impr. <br />Dear John, <br />RoM.r N Nuw.r. !' r <br />luwpA ( A**,4,&. P r <br />Rr.dlu•d A 1 rmNp P l <br />Rn A.nl l I.,—, P f <br />r. w. ( OP—,. P f <br />(Jr.. R r <br />ArrM A r. n a <br />1M+•..r f rr.. P f <br />Rx hod M or,. P 1. <br />RoAr•r (. 4lunu A( P I <br />Han r.: . •. �. !' f <br />lhu ld ( µ: •'— , P f <br />Inrr A I4.urdl•.. P f <br />H..t A H..—. P f <br />red A f wid. P f' <br />.H.Arf 1 Paw.*— P r <br />Ldr.d U / aukor.. P f <br />Ch-trf A f—ksu. <br />l rr H P.W."k. <br />H.rAv. .H O&W <br />Fnclosed please find Change Order No. 5 which provides for an extension of <br />time for the placement of the bituminous base course and for the installation <br />of a lift station transformer. <br />Because a bitum;nous mat could not be placed on all the streets within the <br />project during the fall construction season, it was decided that none of the <br />streets would be paved at this time. The bituminous base t-vurse will be <br />placed in the spring when road base materials throughout the project have <br />stabilized. <br />The placement of the transformer is necessary to allow for the coilnection of <br />the generator to the new lift station. Addendum No. 1 provided for the change <br />in power supplied by NSP but did not provide for the transformer. <br />The work outlined above is necessary to satisfactorily complete the project <br />and we recommend the change order be approved. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDCRLIK b ASSOCIATES, INC. <br />4 <br />U'4 <br />Michael C. Lynch <br />MCL:1i <br />2298d <br />
The URL can be used to link to this page
Your browser does not support the video tag.