TO: Mark Bernhardson, City Administrator <br />FROM: Glenn R. Cook, City Engineer <br />John R. Gerhardson, Public Works Coordinator <br />DATE: July 19, 1985 <br />SUBJECT: Change Order 11 Crystal Bay Sewer Project 85-1 <br />The following change orders are being presented for review and <br />approval. <br />Change order #1 consists of three changes in the project. <br />Item 41 is a time extension of the completion date from October <br />15, 1985 to December 13, 1985. The reason for the extension of <br />time is because the contractor was unable to start the project <br />until July 1, 1985. There is no cost increase due to the <br />extension of time. We recommend approval of the time extention. <br />Item #2 is A cost increase for relocating the lift station from <br />the south side of Spates Avenue to the north side of Spates <br />Avenue. <br />The contractor has indicated a $5,000 increase in costs due to <br />tighter working conditions. However because we will be removing <br />cost- for paving blocks and tree removal the actual cost increase <br />amouâ–º.,:,, to $3,512. We recommend approval of this amount. <br />Item #3 is a possible pipe size change for approximately 2500 <br />Teet of the project from the lift station at Spates Avenue to the <br />intersection of Lakeview Avenue and Arbor Street. <br />We have been informed that the PCA is recommending increasing the <br />size of that amoun,c of pipe from 8" to 10". PCA has stated that <br />at 0.32% grade is not sufficient and is recommending a 0.40% <br />grade. The estimated cost to lower the pipe to accommodate the <br />increased grade is $32,000. The alternate is to increase the <br />pipe size to 10" which can be placed at a flatter grade. <br />A preliminary estimate for the increase in pipe size was <br />$2,500.00. Originally we were going to recommend approval of the <br />pipe size change but a confirmed amount has indicated the cost <br />for increase in pipe size is not $2,500 but $9,966.59. <br />Therefore we will be discussing with PCA whether or not they will <br />issue a permit for using 8" pipe throughout the entire project. <br />If not we would recommend approval of $9,966.59 increased cost to <br />the project contingent upon PCA denial for using 8" pipe <br />throughout. <br />