My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.3. The Contractor's duties with respect to progress of the work are set <br />forth in Section 3, paragraphs 3.6, 3.7, 3.8 and 3.9. <br />7.2.4. The Contractor' duties with respect to insurance and bonds, legal <br />responsibility and safety are set forth in Section 6. <br />a <br />A 7.3. OWNER'S RESPONSIBILITIES <br />( 7.3.1. The Owner shall issue all communications to the Contractor through the <br />a <br />Engineer. <br />7.3.2. The Owner shall furnish the data required of the Owner under the Con- <br />tract Documents promptiv and shall make payments as provided to the Contractor <br />promptly after they are due. <br />7.3.3. The Owner's duties in respect of providing lands and easements and <br />providing engineering surveys to establish reference points are set forth in <br />paragraph 5.1 and 5.3. The Owner shall make available to the Contractor <br />copies of reports of investigations and tests of subsurface and latent physi- <br />cal conditions at the site or otherwise affecting performance of the work <br />which have been relied upon by the Engineer in preparing the drawings and <br />specifications. Such reports are not guaranteed as to accuracy or complete- <br />ness and are not part of the Contract Documents. <br />7.3.4. In connection with the Owner's rights to request changes in the work <br />in accordance with Section 10, the Owner (especially in certain instances as <br />provided in paragraph 10.4) is obligated to execute Change Orders. <br />7.3.5. The Owner's responsibility in respect of certain inspections, tests <br />and approvals is set forth in paragraph 8.10.2. <br />!• 7.3.6. In connection with Owner's right to stop work or suspend work, see <br />paragraphs 8.17 and 12.1. Paragraph 12.2 deals with the Owner's right to <br />terminate services of the Contractor under certain circumstances. <br />t+ <br />7.4 ASSIGNME.NT OF CONTRACT <br />The Contractor shall neither sublet, sell, transfer, assign or otherwise dis- <br />pose of the Contract or any portion thereof, or of his right, title or inter- <br />ns est therein, or his obligations thereunder, nor, if this Contractor is a cor- <br />porate entity, sublet, sell, transfer or assign a majority of the outstanding <br />1 shares of stock in the corporation, without prior written consent of the <br />r Owner. In case written consent is given, the Contractor will be permitted to <br />sublet a portion of the contract or corporate stock thereof, but shall per - <br />it form, with his own organization, Work amounting to not less than 50 percent of <br />the total original contract price. No subcontracts or transfer of contract or <br />to corporate stock %hall release the Contractor of his liability under the Con- <br />tract or Bonds. <br />of <br />to <br />- 21 - <br />1 /85 - 9505h <br />copyright 1995 <br />Ronestroo, Rose ne, Anderlik <br />
The URL can be used to link to this page
Your browser does not support the video tag.