My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.5.4 Contractor shall designate a responsible member of his organization at ' <br />the site whose duty shall be the prevention of accidents. This person shall <br />be Contractor's superintendent unless otherwise designated in writing by Con- <br />tractor to Owner. <br />6.5.5 Contractor agrees to indemnify the Owner and Engineer and their agents <br />and employees against all claims, demands, losses, damages and expenses (in- <br />cluding attorneys' fees) arising out of or resulting from the contractor's <br />violation of any safety law, regulation or code (including without limitation <br />OSHA) or any other prudent precaution. <br />6.6 WARNING SIGNS At0 BARRICADES <br />The Contractor shall provide adequate signs, barricades, colored lights and/or <br />watchmen and take all necessary precautions for the protection of the Work and <br />the safety of the public. All barricades and obstructions shall be protected <br />at night by colored signal lights which shall be kept in operation from sunset <br />to sunrise. <br />SECTION 7 <br />ENGINEER -OWNER -CONTRACTOR RELATIONS; <br />ARBITRATION: INDEMNIFICATION <br />7.1 ENGINEER'S STATUS AND AUTHORITY <br />7.1.1 Engineer will be Owner's representative during the construction period. <br />The duties and responsibilities and the limitations of authority of Engineer <br />as owner's representative during construction are set forth in the Contract <br />Documents and shall not be extended without written consent of Owner and Engi- <br />neer. <br />7.1.2 Engineer will make visits to the site at intervals appropriate to the <br />various stages of construction to observe the progress and quality of the <br />executed Work and to determine, in general, if the Work is proceeding in <br />accordance with the Contract Documents. Engineer is not required to make <br />exhaustive or continuous on -site inspections to check the quality or quantity <br />of the Work. On the basis of such visits and on -site observations, Engineer <br />4 <br />will keep Owner informed of the progress of the Work and will endeavor to <br />guard Owner against defects and deficiencies in the Work. <br />7.1.3 If Owner and Engineer agree, Engineer will furnish a resident project •' <br />representative to assist Engineer in observing the performance of the Work. <br />The Resident Project Representative shall work under the authority and direc- <br />tion of the Engineer. The duties and responsibilities of the Resident Project <br />Representative shall not exceed those duties and responsibilities of the Engi- <br />neer as set forth in the Contract. It stall be to the discretion of the Engi- <br />neer to delegate to the Resident Project Representative those duties and tasks <br />that are within the authority of the Engineer perform. In general, the <br />1/B5 - 8505b <br />(":opyright 1985 <br />Bonestroo, Rosene, Anderlik <br />6 Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.