My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16.700.6. METIIOD OF KASlM: All paint. hall be measured by the lineal <br />foot based on the required or specified widt� line. Measurement of dashed <br />lines will include the e4.ip. Dashed lines 11 it: painted in :0 foot segments <br />with 40 foot gaps. <br />16,200.7. BASIS OF PAYMENT: Payment for all painting at the contract price <br />shall include all necessary cleaning a, paint application and all costa in- <br />cidental to the operation. Payment she;. be based on the following units: <br />I tom No. Item Unit <br />0564.603 4" wide b,-ken line, ye low -paint in.ft. <br />0564.603 6" W.'Ov (,ro.-iswalk series, white -paint L.n.ft. <br />0564.603 24" wide stop lines, white -paint Lin.ft. <br />0564.603 4" wide solid line, white -paint Lin.lt. <br />0564.603 4" wide solid line, yellow paint Lin.tt. <br />16' :'00-2 <br />0- 80 74 c <br />1'.)pyright ► 81 <br />Nunrstr(m, 1--*cne, Ander! i'� <br />6 Anovocietes, t►►i <br />
The URL can be used to link to this page
Your browser does not support the video tag.