My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-1985 Council Packet
Orono
>
City Council
>
1985
>
06-24-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:14:06 AM
Creation date
12/4/2025 10:08:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File 918 - Subdivision <br />John D. Nordstrom <br />541 Spring Hill Road <br />June 19, 1985 <br />Page 4 <br />4. cont. Applicant must provide adequate security and enter into a <br />developer's agreement if the private road and existing driveway re- <br />moval are not completed prior to final plat approval. Applicant to <br />submit plans of restoration of driveway area prior to alteration for <br />Orono staff approval. Engineering plans for private road must be <br />approved by the Orono staff prior to construction. <br />5. The City will ask for underlying road and utility easements over <br />Outlot A - maintenance covenants for upkeep and maintenance of private <br />road. Applicant must submit proof within private covenants that <br />shared drives, ownership and maintenance is shared by Lots 1, 2 and <br />3. <br />6. The area of the property involved in Lydiard Lake (below elevation <br />9701) must be described in angles and bearings and designated as <br />drainage easements. The drainage easements are to be dedicated on <br />the plat for public use. <br />7. Payment of $800.00 park dedication fee ($200.00 for each lot). <br />
The URL can be used to link to this page
Your browser does not support the video tag.