Laserfiche WebLink
Iv1INUTES OF THE ORONO PLANNING C01V.IlvfISSION <br />MEETING HELD ON OCTOBER 17, 1994 <br />(#5 -#1960 -Johnson/Navarre Congregation of Jehovah Witnesses -Continued) <br />Schroeder moved, Lindquist seconded, to approve Application #1960 for variance and <br />conditional use perrrut per conditions set forth in Staff memo to include a 15' drainage <br />easement over proposed drainageway subject to approval of the drainage plan by the City <br />Engineer, striping of the parking lot, and a $50 fine for the after-the-fact permit . Ayes 7, <br />Nays 0. <br />(#o) #1965 GUSTAFSON DESIGN/JAMES LEAR, 2525 DUNWOODY A VENUE - <br />CONDITIONAL USE PERMITNARIAi~CE-CONTINUATION OF PUBLIC <br />HEARING -8:25-8:40 P.M. <br />Mr. Lear and Mr. Gustafson were both present. <br />Gaffron reported this application was tabled from the last meeting awaiting a detailed <br />landscaping plan which is now included in this package. The bank on the property has <br />failed, and the plan consists of a series of retaining walls of a geo-grid nature with two <br />terraces and a walkway to solve the erosion problem. The existing stairway will be <br />removed . The 43 s.f. shed , which is 6' high, will remain for equipment storageand housing <br />of the irrigation system pump . The City Engineer is in agreement with the plan but had <br />noted the difficulty in mowing the slope area. The applicant decided not to mow the <br />slopes, instead protecting the areas with erosion mats and mulch . Gaffron sai d the <br />Engineer did not want boulder-type rock which resulted in a plan consisting of a "lannon" <br />stone product with fabric laid underneath. Staff commented that this plan should solve <br />the slope issue and erosion problems . <br />Rowlette remarked, that should the shed deteriorate, a 20 s.f structure would be expected <br />in the future. It was noted that the layer of fabric to be used in the plan was not <br />considered hardcover, and the rip-rap will need to be approved by the watershed district . <br />Nolan moved, Berg seconded , to approve Application #1965 with the Staff <br />recommendation that a representative of American Engineering Testing be on site to <br />observe the conditions during construction. Ayes 7, Nays 0. <br />(#7) #1967 K-P PROPERTIES/ROBERT OLSON, 4645 BAYSIDE ROAD - <br />PRELIMINARY SUBDMSION -REFERRAL FROl\-1 COUNCIL -8:40-9:00 P.l\-1. <br />Mr. Peterson and Mr. Olson were present. <br />5