My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-1985 Council Packet
Orono
>
City Council
>
1985
>
04-08-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 9:41:57 AM
Creation date
11/20/2025 9:34:10 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 12 - <br />g, Memorial Arbor: The existing arbor asnould be removed and <br />replaced with one replicating the architectural style of the <br />house. Specifically, the memorial arbor should recall the <br />feeling of the porch and utilize the pillars salvaged when <br />the house was raised. <br />h. Gazebo: The boathouse/gazebo is being restored in 1985. The <br />top story will be a pleasant place to rest with panoramic <br />views of the Lake, formal garden, and the remainder of the <br />Estate. <br />i. Maintenance Services: A small work area and storage space is <br />provided as part of the visitor center building. The storage <br />of most maintenance equipment and large materials and <br />supplies will be in the main Darn across County Road 51. <br />j. Irrigat: n System: The water distribution system will <br />require some improvement as the existing system is antiquated <br />and a maintenance problem.. <br />3. Capital Funding <br />Capital funding for the development of the Estate Garden will come <br />'0vt A <br />froin twa possible sources. Excess earnings from the funds given by <br />Mrs. Hoppe will be used for development projects. In addition, the <br />District will seek contributions from individuals, organizations, <br />foundations, and corporations to finance the development of the <br />park, particularly for sponsorship of specitic features (fountains, <br />pools, plaza, etc.) as called for in the concept plan <br />Preliminary Cost Estimates (based on 1985 construction) are as <br />follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.