Laserfiche WebLink
'• ri;.4u11 1V tJ. �7�VJGJ <br />• � � , • it �- w <br />' DATED June 139 1978 <br />SPECIAL PROVISIONS <br />• (Only the numbered Special Provisions apply to this permi:t.),- <br />• 9 The permittee -shall comply with all rules,regulations, requirements, or• standar <br />_ <br />of the Minnesota Pollution Control Agency and other applicable federal, state, o <br />local agencies. <br />The use of explosives in any of the waters of the state is prohibited unless the <br />local State Conservation Officer is notified thereof at least 48 hours in advanc <br />of the time the work is to be done.• (M. S., Sec. 101.42, Subd. 11). <br />Before construction and after completion of the project authorized, permittee sh; <br />supply the Regional Hydrologist with photographs of the project area. <br />Spoil material shall not be placed on the beds of public waters, and, wherever <br />possible; such material should not be placed anStahere within areas subject to <br />flooding. In the. event spoil must be placed within flood plain areas because are <br />free from flooding are not readily available, the spoil should be placed parallel <br />•to, the direction of flood flow and/or spread over a large area so as to minimize <br />any possible obstruction to the passage of flood waters. _ <br />10 Future maintenance of this project shall not -exceed the dimensions herein author! <br />Prior to commencing any maintenance permittee shall advise the Regional Hydrologi <br />Maintenance excavation shall not be 601 1enced until permittee*s receipt of the <br />Regional Hydrologist=s approval. - <br />Il This permit does not obviate any reguirement for federal assent from the U.S. Cor <br />• of Engineers, 1210 U.S. Post Office and Custom House,, St. Paul, M. 55101. <br />Permittee -shall seed a strip of land abutting both sides of 'the ditch to permanen <br />grasses and :legumes, these strips to meet one' of ,the following standards: <br />.A.' Each strip shall be at least 40 f eet `wide -for the full length of the <br />excavated ditch and shall not be mowed prior to•'July`15 -in any year; or <br />M. -Each strip 'shall :be at least- 25 feet wide for the- full length of the ex- <br />_ :cavated ditch, provided of . these narrower strips -.shall not. be done <br />Any organic materials . or' mud wave that may be* raised' or pushed, up above the exist. <br />Ing lakebed as a result of grade fill placement shall be removed to the satisfacti <br />of the Department" of Natural ' Resources. - <br />1 - 'r,P.ermittee ,shall notify the Regional Hydrologist at' 296-7523, -and Conservation Offi <br />Bea -Ransfer-- "' ; -,at -735=6369 hours prior to intent to commence author <br />Jzed work. <br />-13 Permittee . shall notify the Regional Hydrologist im3nediately upon completion of <br />authorized work so -that a final inspection can -be conducted.** <br />14 <br />-Tlhen work isperformed by contract, the permittee shall, prior to commencement of <br />work, notify the Regional Hydrologist, in writing, the name. of the contractor, <br />the addrpess, phone,number -and project fore m' an. for project. <br />: (See • reverse side' for' additional -provisions, if any.) <br />