Laserfiche WebLink
mr. Bernard J. Iiarrington <br />• January 10, 1978 <br />Page 2 <br />presented to the Iletropolitan Waste Control Commission <br />for your approval and yet no action has been taken. <br />4. The original Comprehensive Sewer Plan prepared by Orono <br />in October of 1976 projected the City's sewer needs <br />through the year 2000. The Iletropolitan Waste Control <br />Commission staff objected to any reference being made in <br />our Comprehensive Sewer Plan beyond the year 1990 and <br />we were requested by the Metropolitan Council staff to <br />so amend our plan as to remove any references beyond the <br />year 1990. The Orono -Long Lake interceptor is presently <br />designed to provide capacity as projected by the City <br />through the year 2000 for only that part of the City lying <br />in sewer service areas 1 through 8. The balance of the <br />City, which you are including in your sewer service area <br />map, is not included in a projected sewer area until at <br />least after the year 2000. <br />The inclusion of rural Orono into the sewer service area of the Orono - <br />Long Lake interceptor by the Waste Control Commission is in serious <br />(• conflict with the City's established land use planning for that area. <br />The results of this conflict mean that these lands will be included <br />in the urban service area by the. Metropolitan Council rather than <br />the rural service area as requested by the City's comprehensive <br />planning. The City views this as a major obstacle preventing the <br />statutory right of the City to plan its land use patterns within <br />the structure of its comprehensive land use planning. <br />4p <br />The City has requested several times in the past -four months to have <br />a meeting with you to resolve this issue. The City is willing to <br />negotiate this matter in order to alleviate any problems that the <br />Waste Control Commission may have with•reserve.capacity, originally <br />programmed for Orono, or any other concerns that the Waste Control <br />Commission may have. We feel that it is important that these <br />negotiations be culminated at an early time so there will be no <br />additional delays in the construction of the Orono -Long Lake intercept( <br />Until the sewer service area of the Orono -Long Lake interceptor has <br />been finally determined and acceptable to the City, we are unable to <br />respond to the System Statement prepared by the Metropolitan Council <br />dated June 23, 1977. Because of this inconsistency of the sewer servi <br />area, the public hearing process allowing the City to object to the <br />System Statement has been kept open until this issue has been <br />resolved. This is yet another reason why this inconsistency must <br />be resolved at an early date. <br />