Laserfiche WebLink
• object to and take the appropriate actions to delay the con- <br />struction of the Orono Interceptor until such time as the <br />Systems Statement more accurately reflects the criteria set <br />forth herein, but such actions by the City of Orono would be <br />inconsistent with the City's long -stated desire to cooperate <br />with the Metropolitan Council and Metropolitan Waste Control <br />Commission in developing land use plans which are consistent <br />with all agencies and which will insure that the interceptor <br />could be constructed to remove the points of pollution without <br />having the construction of the interceptor adversely affect <br />the environment of the area, the health, safety and welfare <br />of the citizens of Orono, and which plans will insure that <br />the presence of the interceptor would not mandate a location <br />of the future MUSA, MSSR and Interceptor Sewer Service Area <br />lines which would include areas of the City of Orono which <br />should be in the General Rural Use Region of the Rural <br />Service area for the City of Orono as shown on Exhibit A. <br />• <br />4. Based upon the assurances of the staff of the <br />Metropolitan Council that the above objectives will be accom- <br />plished as soon as the necessary redrafting of documents can <br />be accomplished, and for the reasons set forth above, the City <br />of Orono will not appeal the Systems Statement and will grant <br />to the Metropolitan Waste Control Commission the necessary <br />building permits, conditional use permits and variances from <br />the Zoning Code of the City of Orono to allow for the construc- <br />tion of the Orono -Long Lake Interceptor, conditioned upon the <br />following: <br />A. The City of Orono is included in all preconstruc- <br />tion meetings. <br />B. The City of Orono must first approve any changes <br />in the construction methods or pipe location which changes <br />could or may tend to adversely affect the environment and land <br />use in the City of Orono. <br />C. The City of Orono shall stop the construction of <br />the pipe if the construction is in violation of the permits <br />issued, the ordinances of the City of Orono, the ordinances <br />and regulations of the Minnehaha Creek Watershed District, <br />Lake Minnehaha Conservation District, Department of Natural <br />Resources or any other agency having jurisdiction over the <br />construction of the pipe. <br />5. Attached to this resolution as Exhibit C and incor- <br />porated by reference, are copies of some of the documents <br />upon which the policies and statements set forth in this <br />resolution are based. <br />-7- <br />