My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 901
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 0900 - 0999 (April 13, 1978 - February 27, 1979)
>
Resolution 901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 10:09:46 AM
Creation date
11/16/2015 10:09:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Summary <br />of Ultimate Design <br />Capacity Assigned <br />to the City <br />of Orono: <br />Residential, <br />Commercial and <br />Sewered <br />Sewered <br />Industrial Aver- <br />Residential <br />Residential <br />aye Daily Flow <br />Population <br />Dwelling <br />Units <br />Orono pumping <br />.97 MGD <br />7,699 <br />2,406 <br />units <br />station <br />Long Lake pumping <br />.11 MGD <br />165 <br />52 <br />units <br />station <br />Orono Municipal <br />.06 MGD <br />522 <br />163 <br />units <br />pumping stations <br />TOTAL <br />1.14 MGD <br />8,386 <br />2,621 <br />units <br />H. To allocate the total available sanitary sewer <br />capacity assigned to the City of Orono only to those areas <br />which are within the revised MUSA, MSSR and Interceptor Sewer <br />Service Area lines as shown on Exhibit A. <br />I. That the ultimate capacity of the Orono Long -Lake <br />Interceptor is 1.77 MGD. The portion of the total assigned <br />to the City of Orono is 1.14 MGD. Future planning will be <br />based on the Interceptor Sewer Service Area line to be shown <br />on Exhibit A and upon a flow of 115 gallons per capita per day <br />and 3.2 people per household. <br />2. The City of Orono understands from Mr. John Boland's <br />letter of March 31, 1978, that all of the above criteria are <br />acceptable to him and the staff of the Metropolitan Council <br />with the exception that the staff of the Metropolitan Council <br />recommends that there is no procedure available to move the <br />MSSR line, the MUSA line and the Interceptor Sewer Area line <br />until all of the Comprehensive Land Use Plans of the adjacent <br />municipalities are submitted and reviewed by 1980, pursuant <br />to the Land Use Planning Act. The staff has also stated that <br />it is premature to approve the Comprehensive Sewer Plan sub- <br />mitted by the City of Orono in October, 1976, as amended in <br />April, 1977, and on March 16, 1978, and that in lieu of <br />approval of the Comprehensive Sewer Plan, the staff will <br />recommend approval of a Interim Comprehensive Sewer Plan to <br />be submitted by the City of Orono based upon the criteria set <br />forth herein. <br />3. The City of Orono could appeal the Systems Statement <br />of June 23, 1977, as amended on March 31, 1978, and could <br />• -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.