|
►V)P!`SAs POR _RTS'' .L RAY SANIT.A[T SEWTR IIPROV9MENTS ORONO, MINNESOTA PACE 3.
<br />sf: "RCT or. 119i8 - FILE W. 13918
<br />1.A.R.I.
<br />CONTRACTING
<br />2. PROGRESSIVE
<br />3. ORFEI 4 SONS
<br />4.
<br />YIDMER
<br />S. 8A23AROSSA
<br />PROPOSAL Im
<br />INC.
<br />C0NTRACT0RS, INC.
<br />INC.
<br />INC.
<br />4 SONS, INC.
<br />Description
<br />antic
<br />Units
<br />(loll
<br />Total
<br />unit
<br />Total
<br />Unit
<br />Total
<br />Unit
<br />Total
<br />unit
<br />Total
<br />PART II - STMET GRADING SURFACING & RESTORATION -
<br />CONT'D
<br />I?^ RrT, Ciess S, culverts in PL.
<br />ill
<br />L.I.
<br />15.00
<br />!,725.00
<br />18.60
<br />2,139.00
<br />18.53
<br />2,130.95
<br />24.00
<br />2,760.00
<br />30.00
<br />3,450.00
<br />Relove •-rd transplant trees
<br />150
<br />Ea.
<br />54.00
<br />8,100.00
<br />110.00
<br />16,500.00
<br />113.30
<br />16,995.00
<br />175.00
<br />18,750.00
<br />60.00
<br />9,000.00
<br />Remove and transplant ebrubs
<br />1,200
<br />L.F.
<br />8.50
<br />10,200.00
<br />8.00
<br />9,600.00
<br />2.06
<br />2,472.00
<br />12.50
<br />15,000.00
<br />10.00
<br />12.000.00
<br />3" sugar aapte. R a R
<br />15
<br />Ea.
<br />275.00
<br />4,125.00
<br />230.00
<br />3,4A0.00
<br />303.85
<br />4,557.15
<br />225.00
<br />3,37,.00
<br />300
<br />1.,500.00
<br />'olorodo green spr,ce 6'RigR, 8 4
<br />8 t5
<br />Ea.
<br />190.30
<br />2,100.00
<br />190.00
<br />2,850.00
<br />118.45
<br />1,776.75
<br />180.D0
<br />2,700.00
<br />200.
<br />,,000.00
<br />Sod with 1" topsail
<br />•,500
<br />S.Y.
<br />2.30
<br />5,150.00
<br />1.35
<br />3,375.00
<br />2.06
<br />5,150.00
<br />i.80
<br />4,50G.00
<br />2.50
<br />6,250.00
<br />Seeding, rl. 5, r.'3" cnpsoil,
<br />fertiliser S oiler
<br />10.0
<br />Ac.
<br />4,N10.00
<br />46.100.00
<br />525.00
<br />`,250.0-)
<br />2,98-,.00
<br />29,870.00
<br />1,900.00
<br />19,C09.00
<br />3,500.00
<br />35,000.00
<br />Siltation trosi*n con rol fence,
<br />+tirafi "t8vcrafen1e",0r appravol
<br />equal 100
<br />L.P.
<br />2.15
<br />645.00
<br />4.C'7
<br />120',.00
<br />2.28
<br />684.00
<br />4.00
<br />1,200.00
<br />3.00
<br />9M .00
<br />Rts"ard 2' a 3' CR
<br />0.2-"67 cats. in P1.
<br />2
<br />U .
<br />575.00
<br />1,150.M
<br />750.00
<br />1,500.00
<br />678.99
<br />1,357.98
<br />700.00
<br />1.400.00
<br />800.00
<br />1,600,00
<br />12" " flared fna ae;:ti w
<br />Ea.
<br />205.00
<br />820.00
<br />300.00
<br />1,200.00
<br />501.25
<br />2.005.00
<br />400.00
<br />1,600.00
<br />500.00
<br />Z,000.%
<br />Rip rap
<br />i0
<br />C.Y.
<br />•28.00
<br />180.00
<br />65.00
<br />650. 0
<br />25.83
<br />259.30
<br />40.00
<br />400.00
<br />40.00
<br />-00.00
<br />pipe! biwitst
<br />5
<br />C.Y.
<br />17.50
<br />87.50
<br />25.00
<br />125.00
<br />18.06
<br />90.30
<br />10.00
<br />50.00
<br />30.00
<br />1 0.00
<br />TOTAL PART II sT m GRADING,
<br />S1!RF&CING 4 RESTORATION
<br />$236,110.50
<br />$208,255.40
<br />5226,651.12
<br />$233,987.00
<br />$215,311.00
<br />PART III - LIFT STATION
<br />e Qneiruet wstsyrarsr Perpins station,
<br />isciedius precaet concreta structure,
<br />Oqukr at, peeing, site work sod
<br />,electrical work for tM LiTMP SUN of
<br />TOTAL }ART III - LIFT 3TAlON
<br />L.S. L.S. L.S. 51,700.CO L.S. 52,850.0C L.S. 46,396.42 L.S. 47,000.00 L.S. 43,500.00
<br />Si1,700.00 $52,850.00 $46,396.42 $47,000.00 $43,500.00
<br />
|