Laserfiche WebLink
NOIOS& f0R CRYSTAL SAY SABITARY SEMI 111FOUVWN 'S -- OWW, a121811ESOTA 'AGE 2. <br />P!l nCT OD. MIS PILL /0. 13918 <br />PfOPOfAL ITEM <br />CONTRACTING 2. PROGRESSIVE <br />IRC. COWMACTIORS. INC. <br />3. OR/RI 4 9095 <br />INC. <br />4. YIDNER <br />INC. <br />S. SARSARDSSA <br />_4 SONS, Inc. <br />Descrigtios <br />QoamtLty Ueits Unit Total Unit Total <br />unit Total <br />Osit Total <br />unit Total <br />PART i - SANITAM- SEYRR - C(NT'D <br />9 <br />Ea. <br />130.00 <br />1,170.00 <br />150.00 <br />1.350.00 <br />195.37 <br />1.758.33 <br />160.00 <br />1,620.00 <br />250.00 <br />2,250.00 <br />Service Lima cleamoet <br />Jack or armor 6" CISP incl. <br />SO <br />L.P. <br />175.00 <br />8.750.00 <br />65.00 <br />4.250.00 <br />161.76 <br />8.088.00 <br />175.00 <br />8.750.00 <br />IS0.00 <br />1,500.00 <br />casing Wader Co.Rd. ♦15 <br />as <br />Jerk or eager 8" DIP 4 casing in pl. <br />130 <br />L.P. <br />175.00 <br />22,750.00 <br />135.00 <br />17,550.00 <br />163.84 <br />21,299.20 <br />180.00 <br />23,400.00 <br />150.00 <br />19,500.30 <br />6" M force Yin in place <br />65 <br />L.P. <br />13.00 <br />845.00 <br />18.60 <br />1,209.00 <br />25.96 <br />1.682.40 <br />35.00 <br />2.275.00 <br />20.00 <br />1,300.00 <br />DIP fittings in place <br />300 <br />Lbs. <br />1.30 <br />390.00 <br />1.00 <br />600.00 <br />1.02 <br />306.00 <br />2.00 <br />600.00 <br />2.00 <br />600.00 <br />Rock stabilisatioo (314" sinus) <br />2.S00 <br />T. <br />8.75 <br />21,875.00 <br />9.50 <br />23,750.00 <br />6.16 <br />15.400.00 <br />10.00 <br />25,000.00 <br />8.00 <br />20,000.00 <br />mechanical trench compaction <br />10,500 <br />L.F. <br />0.31 <br />3,255.00 <br />1.')0 <br />10,500.00 <br />0.05 <br />525.00 <br />0.50 <br />5,250.00 <br />3.00 <br />31,500.00 <br />TOTAL PART I - SANITARY SEVER <br />3403.777.15 <br />$431,650.55 <br />S420,225.05 <br />$488.393.00 <br />$538,320.00 <br />PART II - STREST G1yDIMC1 SUIPACING 4 USTORATI08 <br />5.000 <br />C.Y. <br />7.50 <br />12.50.00 <br />I.75 <br />13,750.00 <br />3.24 <br />16,200.00 <br />4.40 <br />22.000.00 <br />3.00 <br />15,000.00 <br />cowwa excavatioo <br />10,000 <br />S.Y. <br />0.75 <br />7,500.00 <br />1.40 <br />14,000.00 <br />0.71 <br />7,100.00 <br />0.70 <br />7.00G.00 <br />0.60 <br />6,000.00 <br />S►tus.inous surfacing removal <br />r!, c aggregate base(100% crushed ) <br />5,S00 <br />T. <br />6.15 <br />44,825.00 <br />9.50 <br />46,750.00 <br />7.88 <br />43,340.00 <br />7.50 <br />41.250.00 <br />7.25 <br />39,875.00 <br />2%1 bituminous wearing surface <br />1.100 <br />T. <br />15.15 <br />16.665.00 <br />13.10 <br />14.410.00 <br />16.27 <br />17,897.00 <br />16.00 <br />17,600.00 <br />13.10 <br />14,410.00 <br />:341 bituminous btodar <br />1,.00 <br />T. <br />14.95 <br />16,445.00 <br />12.90 <br />14,190.00 <br />15.76 <br />17,336.00 <br />15.50 <br />17,050.00 <br />12.90 <br />14,190.00 <br />2%I bituminous leveling course <br />200 <br />T. <br />16.40 <br />3,280.00 <br />15.90 <br />3.160.00 <br />16.7Q <br />3.358.00 <br />16.50 <br />3.300.00 <br />15.90 <br />3,180.00 <br />&C-i bituaLsous material for mixture <br />140 <br />T. <br />211.00 <br />29,540.00 <br />205.00 <br />28.700.00 <br />200.85 <br />28,119.00 <br />197.00 <br />27,580.00 <br />205.00 <br />28.700.00 <br />Sit'Wmiaus material fur tack cost <br />500 <br />Gals. <br />1.55 <br />775.00 <br />1.50 <br />750.00 <br />1.60 <br />900.00 <br />1.80 <br />900.00 <br />1.50 <br />750.00 <br />2341 bitum. street 4 drivway patching 150 <br />T. <br />46.50 <br />6,975.00 <br />45.00 <br />6,750.00 <br />49.44 <br />7,416.00 <br />38.00 <br />5,700.00 <br />45.00 <br />C,750.00 <br />Concrete drivwas pavement <br />w/66/1010 wire mesb <br />120 <br />S.Y. <br />27.00 <br />3.240.00 <br />26.00 <br />3,120.00 <br />25.75 <br />3,090.00 <br />35.00 <br />0,200.00 <br />30.00 <br />3,600.00 <br />"Crass paver" concrete grid <br />36 <br />S.T. <br />33.00 <br />1,188.00 <br />32.40 <br />1.166.40 <br />70.04 <br />2,521.44 <br />27.00 <br />972.00 <br />35.00 <br />1.260.00 <br />Clear snd grub troea <br />145 <br />Ea. <br />75.00 <br />10.673.00 <br />90.00 <br />13.050.00 <br />77.25 <br />11.201.25 <br />100.00 <br />14,500.00 <br />1.00 <br />145.00 <br />aamove culverts <br />120 <br />L.P. <br />6.00 <br />720.00 <br />5.00 <br />600.00 <br />6.67 <br />824.40 <br />10.00 <br />1,200.00 <br />10.00 <br />1,200.00 <br />