My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-2025 - Agenda Packet Planning Commission - Full Packet
Orono
>
Planning Commission
>
2025
>
11-17-2025 - Agenda Packet Planning Commission - Full Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
11/14/2025 3:44:29 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Full Packet
Document Date
11/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
performance of the Grantee's sewer shall require Grantee's <br />express written approval, by way of illustration but not <br />limitation such as permeable pavers and stormwater <br />management systems. Grantee shall restore the surface to a <br />comparable condition as existed prior to the Grantee's work, <br />which includes replacing all grass, sod, and bituminous <br />parking surfaces, and lake channel edging surfaces (granite <br />riprap and gravel) within the disturbed portion of the <br />Permanent Sanitary Sewer Easement Area. <br />2. Grantee's Maintenance, Access and Soil Compaction. <br />a. Routine Maintenance. Grantee will perform major, impactful <br />routine maintenance, which by way of illustration and not limitation, <br />includes force main cleaning, during of the period of October 15 to March 30 <br />(the "Off Season"), following the provision of prior written mailed notice <br />provided to Grantor a minimum of seven (7) days prior to commencement of <br />the maintenance as provided in Section 4. During the Off Season, in the <br />performance of routine maintenance activities, Grantee, its employees, <br />contractors and agents may utilize portions of the Property outside of the <br />Permanent Sanitary Sewer Easement Area for parking of vehicles and <br />equipment related maintenance activities. <br />Grantee will perform minor, non-impactful routine maintenance which by <br />way of illustration and not limitation includes changing carbon filtration on <br />the odor control components or air relief valve maintenance of the <br />improvements as needed and provide notice one (1) business day to Grantor <br />via email and telephone. In the performance of minor routine maintenance <br />of the improvements that occur outside of the Off Season, Grantee may utilize <br />two parking stalls which are located over the Grantee's subsurface <br />improvements. <br />b. Emergency Work. In the case of Emergency Work, Grantee shall <br />provide notice as provided in Section 4 as soon as practical. "Emergency <br />Work" is work that requires immediate action to correct or avoid (a) threats <br />or harm to the health and safety of the public, contractors, and/or employees <br />or (b) threats or harm to the Grantee's facilities, Grantee's infrastructure or <br />property. <br />C. Soil Compaction and Restoration. Unless otherwise agreed to in <br />writing by Grantor, Grantee will restore the disturbed portions of the <br />4 <br />Project MCFS 8567 Forcemain Replacement at Channel Crossings 4 of 14 <br />Hennepin County Parcel 08.1 17,23.34,0061 <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.