Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 7641 <br />require 14 SAC units in total according to the 2024 Met Council determination letters. <br />The 2025 SACs have not increased. The SAC will be collected with each building permit. <br />The current 2025 SAC is $2,485.00 per unit which would result in a total of $34,790.00 <br />or 14 x $2,485) required to connect all buildings in 2025. <br />i. Buildinq 1: 1 SAC Unit = $2,485 <br />ii. Building 2: 3 SAC Units = $7,455 <br />iii. Buildinq 3: 4 SAC Units = $9,940 <br />iv. Building 4: 4 SAC Units = $9,940 <br />v. Building 5: 2 SAC Units = $4.970 <br />c. Water and Sewer Connection Fee: The City of Orono does not have a per unit <br />breakdown for industrial uses. Following Met Council's logic, the City finds it appropriate <br />to apply the same SAC unit determination when applying the City's water and sewer <br />area connection fees. <br />The water and sewer area connection fees for each building will be collected with each <br />building permit. Based on the City's official 2025 Fee Schedule, a $4,370.00 water unit <br />connection fee and $6,000.00 per sewer unit will be applied (total $10,370.00 per unit) <br />as follows: <br />i) Buildinq 1: 1 SAC Unit = $10,370.00 <br />Buildinq 2: 3 SAC Units = $ 31,110.00 <br />iii) Building 3: 4 SAC Units = $ 41,480.00 <br />iv) Building 4: 4 SAC Units = $ 41,480.00 <br />Building 5: 2 SAC Units = $ 20,740.00 <br />All 5 buildings will result in 14 SAC units, totaling $145,180.00 (14 x $10,370.00) to connect <br />to the City's water and sewer systems. <br />9. The City Clerk shall release the plat documents for filing only upon certification by the City <br />Attorney, Community Development Director, and City Engineer that all requirements of the <br />platting regulations have been satisfied. <br />10. Phased Development /Staging: Phase 2 will include construction of Building 3, 4 and 5 as <br />shown on Exhibit A. Approval of the Final Plat, recording of the development agreement, <br />and easement must be completed before building permits are issued. <br />11. Upon substantial completion of Buildings 3, 4 and 5, executed Mylars must be submitted to <br />the City for recording for Phase 2 Final Plat. The City will not conduct the final building <br />inspection or issue occupancy certificates for the buildings until the Mylars are recorded. <br />