Laserfiche WebLink
RESOLUTION OF THE CITY COUNCIL <br />NO. 7641 <br />WHEREAS, the Developer will be required to record the final plat with Hennepin <br />County once the building is substantial completed following the CIC platting requirements. <br />NOW, THEREFORE, BE IT RESOLVED, based upon the findings of Resolution <br />No. 7579 and 7586, the Orono City Council does hereby approve the plat of ORONO GARAGE <br />CONDOMIMIUM CIC Plat for Phase 2: Buildings 3, 4 and 5 (a copy of which is attached as <br />Exhibit A), subject to the following conditions: <br />1) Development within ORONO GARAGE CONDOMIMIUM is subject to the Conclusions, <br />Orders, and Conditions enumerated within Preliminary Plat, Conditional Use Permit and Site <br />Plan approval Resolution No. 7579 dated April 28, 2025. <br />2) Dedication on the plat of the Ingress, Egress, Drainage and Utility Easements as required in <br />Resolution 7579. <br />3) The approvals granted in this Resolution shall become effective only when all conditions of <br />approval requiring actions by the Developer have been satisfied. <br />4) Minnehaha Creek Watershed District (MCWD)-approved permits for the grading, stormwater <br />management facilities, storm water pollution prevention plan (SWPPP), and erosion control <br />shall be submitted as required. <br />5) An" tinforl Alta Commitment for Title Insurance dated April 16, 2025 and certified copies of <br />all recorded easements currently affecting the Property have been submitted. <br />6) The Property is within the MUSA and will be served by the city's sanitary sewer and public <br />water connections. <br />7) Payment of Development Fees Required (2025 fee schedule): Total: $47,384.10. <br />a. stormwater and Drainage Trunk Fee: $47,384.10. <br />8) Additional fees will be required with the appliable building permits for the site as follows: <br />a. Water and Sewer Connection Permits: Connection permits will be required for each <br />individual unit (85 units proposed) and will follow the applicable fee schedule for the year <br />I <br />n which they connect. The individual permits and fees will be due at the time the <br />connections are a installed to serve each unit. The fees will be collected with the building <br />permit for the subject building. <br />b. Met Council Sewer Availability Charge ("SAC"): Due to the size of the buildings and <br />the number/type of proposed connections it is estimated that the development will <br />2 <br />