Laserfiche WebLink
R. TESTS: All compaction and material tests required it, the specifications <br />shall he paid for by the Owner. Tf Anv of the tests fail to meet <br />specifications, the contractor •,hall reimburse the Owner for the cost of all <br />subsequent tests to ensure compliance with specifications. <br />The City of Orono will make an inspection of the oroject in the Spring of ig8h <br />prior to the end of the warranty period, fh,� inspection will-.onsist of <br />televising the lines, infiltration testing and left-r.-t.ion teats. <br />Q. EXISTING UTILITIES. All known existing iitil+ties are shown in the plan in <br />a general way only and the Owner does not warrant the exact location. It <br />shall be the Contractor's responsibility to verify all existing (utilities and <br />to check with utility companies prior to starting work. The Contractor shall <br />also be responsible for taking all neceAaary precautions to prevent damage to <br />existing utility lines. The crossing, relocation, removal, shoring, <br />compaction and other protective procedures necessary to protect- the utilities <br />shall be considered incidental. to the project. <br />10. PROPERTY ACCESS: The contractor shall be required to provide vehicular <br />access to 81. te9idents at the end of every construction day. The contractor <br />shall notify the property owner twenty-four �24) hours in advance of the time <br />property access will he limited during the construction day. The contractor <br />shall provide Access to within one block of each resident's home at all times. <br />11. PRE -CONSTRUCTION _ CONFERENCE: Prior to starting work, the Contractor <br />shall meet with the Engineer to discuss the method and means of supply, a work <br />schedule as to construction phases and a general. review of the specifications. <br />Within 10 dava of the pre -construction conference. thn Contractor shall submit <br />to the Engineer a written schedule of proposed construction activity, includ- <br />ing cost of construction to he completed each month. The it-hedule should <br />address the phasing of construction in a manner that will provide access for <br />adjacent homes at all times so that inconvenience to propertv Ywners can be <br />minimized. <br />12. FROSION CONTROL: The Contractor shall he solely responsible for all <br />erosioncontrol procedu-vs. Areas disturbed by construction shall be pro- <br />tected from erosion during construction by use of terraces, ditches, check <br />rums, mulch or any other procedures as are appropriate. All such erosion con- <br />trol procedures are incidental to the contract including erosion control <br />fences at the inlets and outlets of storm newers. The Contractor shall <br />immediately remove anv sedimentation or debris-esulring 'rrim his conatructiom <br />activity. Erosion control fence shall he Mir.afi "r.nv1rofence" or approved <br />egiiAI. The contractor shall review erosion =intro' t,ro!•ek!tJ.ee with the <br />Engineer prior to Rtarting work. <br />1-4. CLRAMUP: The Contractor shalt. tie responsible for cleanup of the con- <br />struction area as incidental to the protect. All c-levnup And roetorsti(M Must <br />be c(maipieted prior to acceptance •-,f the pro iec. t . <br />trSNb! � <br />