My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fj, <br />F <br />P <br />SPECIAL PROVISIONS <br />1. PROJECT DFSCRIP1i0N: This work consists of the installation of sanitary <br />sewer and services in the Crvstal Bay area of the City of Orono as shown on <br />the plans. Also included is grading, subgrade preparation and placement of <br />aggregate base and bituminous surfacing. <br />2. OWNER: The City of Orono is designated a.- the Owner. All work outlined <br />herein is to be constructed within public right-of-way or easements to be <br />obtained by the Owner. <br />3. COMPLETION DATE: The contractor shall complete all work on the project <br />except the hituminous wearing surface by August 15, 1985. The bituminous <br />wear..ag surface shall be completed by June 15, 1986. <br />The contractor shall complete the bitunincus base course or, the streets and <br />repair all driveways within 30 days of the start of construction on any <br />particular street. <br />The contractor shall complete the gravel base construction as soon as possible <br />after the sanitary service lines are completed. <br />4. LIQUIDATED DAMAGES: Liquidated damages as specified in the Conditions of <br />the Contract an,1, be Two Hundred Dollars ($200.00) per calendar day and shall <br />apply to each Lt tie completion dates described in Paragraph 3. <br />5. BASEMENTS: Easements are required for the construction of a portion of <br />work. The G: has initiated acquisition procedures for the easement. <br />Should there ',e any delay in acquiring the easement, a corresponding extension <br />of time of (_ompletion will be allowed for only those portions of the project <br />directly affected by the easement delay. No claim for extra compensation will <br />be allowed or considered by the Owner for delays resulting from casement <br />acquisition. <br />6. SPECIFICATION REFERENCE: Where the Minnesota Department of Transportation <br />specifications are referred to herein and where a reference to the word <br />"State" is mentioned, it is understood that the word "Gwner" is substituted. <br />All reference to the word "Engineer" shall be interpreted as the Engineer for <br />the City of Orono. Minnesota Department of Transportation Specifications for <br />Highwav Construction, 1983 Edition and revisions thereto shall apply except as <br />tinted herein. <br />7. SOIL CONDITIONS: Propective bidders are advised to view the project site <br />to verify to `their own satisfaction soil and water conditions prior to <br />submitting a bid. Soil borings have been taken and are available at the <br />office of the Engineer for inspection during normal business hours and are <br />shown on the plans in a general way. No warranty, either expressed or <br />implied, is intended by the Owner or the Engineer and soil �)oring logs area <br />being made available merely as a convenience for the contractor. <br />SP-i <br />0-- 5914 1 c <br />
The URL can be used to link to this page
Your browser does not support the video tag.