Laserfiche WebLink
11.6 CONGEALED CONDITIONS <br />Should conco !ed conditions encountered in the performance of the Wcrk below <br />the surface of the ground or should concealed or unknown conditions in an ex- <br />isting structure be at variance with the conditions indicated by the Contract <br />Documents, or should unknown physical conditions below the surface of the <br />ground or should concealed or unknown conditions in an existing structure of <br />an unusual nature, differing materially from those ordinarily encountered and <br />generally recognized as inherent in work of the character provided for in this <br />Contract, be encountered, the Contract Scorn shall be eq,itably adjusted by <br />Change Order upon claim by Tither party made within teu t1U) days after the <br />first observance of the con,,ttion9. <br />11.7 CLAIMS FO1- P.DDITIONAL COSTS <br />If the Contractor wishes to make a claim for an increase in the Contract Sum, <br />he shall give the Engineer written notice thereof within ten 'NIO) days after <br />the occurrence of the event giving rise to such claim. This notice shall be <br />given by the :,,,,:tractor before proceeding to execute the Work, except in an <br />emergency endangering life or property in which case the Contractor shall pro- <br />ceed in accordance with Paragraph 11.8. No such claim shall be valid unless <br />so made. If the Owner and the Contractor cannot agree on the amount of the <br />adjustment in the Contract Sum, it shall be referred to the Engineer in accor- <br />dance with Paragraph 5.8. Any change in the Contract Sum resulting from such <br />claim shall be authorized by Change Order. <br />If the Contractor claims that adc;'tional coat is invo.ved because of but not <br />limited to (1) any written interpretation of the engineer, (2) any order by <br />the (Amer to stop the Work where the Contractor was not at fault, (3) any <br />written order for a minor Trange i 1,e Work or (4) failure of payment by the <br />Owner, Contractor shall make su-c►, c, m as provided in S•.jbparagraph 11 '. <br />11.8 WORK D1dRINc' AN EMERGENCY <br />11.8.1 In any emergency affecting the safety of persons or pro; L „ the Con- <br />tractor shall act to prevent threatened damage, injury or loss. In all cases <br />he 0411, as soon as practicable, notifv the Owner of the emergency and he <br />shall wait for the instructions before proceeding to protect both life and <br />'OP.. <br />.8.2 Any additiuna, compei 'ion or extension of time claimed by the ron- <br />ractor on account of said Pn._ !ency w-irk shal l be determined undo r Paragraph <br />11.7 <br />359`,a <br />4181 <br />k- i <br />