My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ir—I <br />L <br />I <br />I <br />SECTION 11 <br />CHANGES IN 1'ile WORK <br />11.1 CHA►.GE ORDERS <br />Without invalidating the Agreement, Owner may, at any time or from time to <br />time, order ad tions, deletions or revisions in the Work; these will be au- <br />thorized by Change Orders. Upon receipt of a Chen a Order, Contractor sh4li <br />proceed with the Work involved. All such Work :hall he executed under tht <br />applicable conditions of the Contract Documenti- If any Change Order cause,; <br />an inc-east of dectease in the Contract Price or extension or shortening of <br />the Contract time, an equitable adjustment will made as provided in Section <br />11 or Section 12 on the basis of a claim made t.., t:-ithtr party. <br />11.14 MINOR CHANGES <br />Engineer may authorize minor changes in the Work not involving an adjustment <br />in the Contract Price or the Contract Time, whi(,, ar,• consistent with the <br />overall intent of the Contract Documents. The-- may he .iccomplished by a <br />Field Order rnd shall be binding on Owner, and also in -.)ntri.10 r who ehal <br />perform ►,,.• -hange promptly. If Contractor believed 'tiat a -:eld Order ju...:.- <br />fies an increase in the Contract Price or Contract ri .,-ontiactor may make a <br />claim therefor As pro ided in this Section li. <br />11.3 UNAUTHORIZED WORK <br />Additional Work performed without authorization of a Change Order will not en- <br />title Contractor to an increase in the Contract Price or an extension of -hr <br />Contract Time, except in the case of an emergency. <br />11.4 ENGINEER RECOMMENDATIONS <br />Owner shall exerute appropriate Change Or 1' epare.: !•. Fngineer covering <br />changes in the Work which are requiredi by Uw�r, or req-1red because of un- <br />fort-Aen physical conditions or emergencie because of uncovettng Work <br />foupA ..ct to be defect:ve, or because of claim of Contractor for a <br />�,...; ;n the Contrar t Time or the Contra wh i • `+ i • recommended by En- <br />X4",let. <br />11.5 NOTICE OF CHANGE TO SURF'ry <br />If notice of env chinge affecting <br />the Contract. Prt-:r is required b•- <br />the S _y, it will be Contracty, <br />and the amount of :,ach applira` <br />tractor ,hall furnish pro f :1 <br />a7 <br />of tut, Work or chrnge in <br />anv Band to 'oe given to <br />,.:, po n,)tifv the Surety, <br />ijuste••1 accordingly. Con- <br />�?JIIYr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.