My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' ner, or appears to he incl-ompetent or to act in a disorderly or intemperate <br />manner shall be discharged immediately and shall not he employed again in <br />' any portion of the Work. <br />7.6 CUTTING nND PATCHING <br />' The Contractor shall du all necessary cutting, fixing or patching of the Work <br />that may be required to make its several parts fit together properly, or to <br />properly receive the Work of the various trades, or, as required t:y the <br />Drawings and Specifications, to complete the Work. He shall restore all 3..ch <br />cut or patched work as approved by the Engineer. Cutting of existing <br />structure that shall endanger the Work, adjacent property, workmen or the <br />public shalt not he done. <br />7.7 WARRANTY AND GUARANTEE <br />' Contractor wartants and guarantees to Owner and Engineer that all. Work will be <br />in accordance with the Contract Documents and will not be defective. Prompt <br />notice of all defects shall be given to Contractor. All defective Work, <br />' whether or not in place, may be rejected, corrected or accepted as provided in <br />Paragraph 7.12. <br />' 7.8 ACCESS TO WORK <br />Engineer and Fngineer's representatives, other representatives of Owner, <br />testing agencies and governmental agencies with jurisdictional interests will <br />have access to the Work at reasonable times for their observation, inspection <br />and testing. Contractor shall provide pr;•per and safe conditions for such <br />access. <br />7.9 TESTS AND INSPECTIONS <br />7.9.1 Contractor shill Rive Engineer timely notice of readiness of the <br />Work for all required inspections, tests or approvals. <br />7.9.2 If any law. ordinance, rule, regulation, cede, or or•ier of any <br />' public body having jurisdiction requiros any Work (or part thereof) to <br />specifically be inspected, tested, or approved, Contractor shall assume <br />full responsibility therefor, pay all costs in connection therewith and <br />' furnish Engineer the required certificates of inspection, testing or <br />approval. Contractor shall also be responsible for and shall pay all <br />costs in connection with any inspection or tenting required in connection <br />with Owner's or Engineer's acceptance of a manufacturer, fabricator, <br />supplier or distributor of materials or equipment proposed to be <br />incorporated in the Work, or of materials or equipment submitted for <br />approval prior to Contractor's purchase thereof for incorp.,ration in the <br />Work. The cost of all other inspections, tests and approvals required by <br />the Contract Documents shall be paid by Owner (unless otherwise specified). <br />7.9.3 A1.1 inspections, tests f- approvals other than those required by <br />law. ordinance, rule, regulation, code or order of any public body having <br />jurisdiction .shall he performed by organizatLons *elected by or acceptable <br />to Owner or FnRineer. <br />;I <br />351ha <br />4J1S1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.