My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.2 ORDER OF PRECEDENCE <br />If there be a conflict between or among any of the terms or provisions of the <br />Contract Documents, which conflict cannot be reconciled by resorting to the <br />intent of this Contract tinder Paragraph 4.1, the conflict shall be resolved by <br />applying the following Order of Precedence: <br />(a) Agreement; <br />(b) Conditions of. the Contract; <br />(c) Special Provisions; <br />(d) Specifications - Specific Requirements; <br />(e) Specifications - General Requirements <br />(f) Drawings. <br />4.3 DISCREPANCIES <br />Any ambiguity or discrepancy in the Drawings and Specifications, no matter how <br />seemingly insignificant to the Contractor, shall be brought immediately to the <br />attention of the Engineer for clarification. Anv Contractor who fails to <br />bring any ambiguity or discrepancy of which it was or should have been aware, <br />shall assume the risk of loss of claim, and shall be allowed no claim for the <br />misinterpretation of the Drawings and Specifications contrary to the intended <br />interpretation of the Engineer. <br />4.4 ADDITIONAL INSTRUCTIONS <br />Further or additional instructions may he issued by the Engineer during the <br />progress of the Work by the use of Drawings or other means to clarify the <br />Contract Documents or tc explain or illustrate changes in the Work to be done. <br />4.5 COPIES OF DRAWINGS AND SPECIFICATIONS FURNISHED <br />Except as provided for otherwise, five (S) copies of Drawings and <br />Specifications shall be furnished to the Contractor without charge. <br />4.6 DRAWINGS AND SPECIFICATIONS AT JOB SITE <br />One complete set of all Drawings and Specifications, Addenda, approved Shop <br />Drawings, Change Orders and Other Modifications shall be maintained by the <br />Contractor at the job Fite and shall be available to the Engineer at all times. <br />4.7 OWNERSHIP OF DRAWINGS AND SPECIFICATION <br />�a <br />All Drawings and Specifications and copies thereof and other data furnished by <br />the Engineer *re and shall remain his property. They are to be used only with <br />respect to this Project and are not to he used on any other project. Said <br />documents are t�+ he returned i,r suitable accounted for to the Engineer on re- a" <br />afi�a <br />
The URL can be used to link to this page
Your browser does not support the video tag.