My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
24,000." c SERVICE RISER PIPE: Service riser pipe will be paid for at the <br />Cnntract Unit Price per linear foot for the vertical distance from the center- <br />line of the sewer to the top of riser. Concrete reinforcement of the main <br />sewer and riser pipe as described in Section 24,000.4.B. shall be considered <br />as incidental and will not constitute a pay item. <br />24,000.9.C. CONSTRUCTING MANHOLES TO DEPTH OF EIGHT FEET: Constructing of <br />manholes to a depth of eight 8 feet will be paid for at the Contra--t Unit <br />Price per manhole which shall include furnishing and placing the manhole frame ..� <br />and corer. This section also applies to all catch basin manholes and catch <br />basins. <br />24,000.9.H. CONSTRUCTING MANHOLES TO A DEPTH GREATER THAN ZICHT FEET: Con- <br />structing of manholes to a depth greater than e Rhtcet wee paid for <br />at the Contract Unit Price per manhole plus the unit price per linear foot for <br />each foot of depth that is greater than eight feet. This section also applies <br />to all catch basin manholes and catch basir.s. <br />24,000.9.I. CONSTRUCTING CATCH BASINS: Constru_ting catch basins as shown on <br />the plans will b�e�pa or at to I retract Unit Price per catch basin which <br />shall include furnishing and placing the catch basin frame ara grating. <br />24,000.9.J. GRAVEL STABILIZATION: Authorized gravel stabilization in place <br />shall be paid for at the Contract Unit Price per ton. <br />24,000.9.K. SAND CUSHION: Granular material fcr a sand cushion in place in <br />rock excavation shall be paid for at the Contract Unit Price per ton. <br />24,000.9.L. DROP INLET PIPE: Drop inlets in p'.ace shall be paid for at the <br />Contract Unit Price per linear foot which shall be payment in full for the ex- <br />tended manhole base, encasement, drop pipe, cast iron tee, cast iron pipe and <br />concrete collar. Payment shall be made for sewer pipe from center to center <br />of all manholes as per Section 24,000.8.C. when cast iron pipe is extended for <br />drop inlets. <br />24,000.9.M. SPECIAL STRUCTURES 6 APPURTENANCES: Basis of payment for special <br />structures :ind apputenances not included above shall be stated in the "Special <br />Provisions," "Specific Requirement," and "Proposal." <br />^4,nOn-is <br />.w <br />171 <br />r <br />2iy4/45S4b <br />(npvrigbt 1494 <br />Sonestroo, Ro%ene, Anderlik <br />6 Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.