My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
24 000.8.(). SERV _ 1C CONNECTION: Wyes and tee branches of each diameter and <br />classification furnished and installed will be measured as a unit. <br />24,000.8.K. SERVICE RISER PIPE: Sewer pipe used for service risers of each <br />diameter and classification furnished and installed will he measured separate- <br />ly by vertical length in linear feet from the centerline of the sewer to the <br />top of the last riser section. <br />24,000.8.F. CONSTRUCTING MANHOLES: Manholes will be measured by depth of the <br />structure from the invert of the pipe to the top of the cover in linear feet, <br />based on the dimensions as staked by the Engineer. <br />24,000.8.G. CONSTRUCTING CATCH BASINS: Catch basins wi'_l be measured by the <br />number of catch asrns completed as to shape, size, and depth according to the <br />plans. <br />24,000,8.H. GRAVEL STABILIZATION: Gravel stabilization will be measured by <br />weight of authorized material deposited in the trv•nch. <br />24,000.8.J. DROP INLETS: Drop inlets will be measured by depth from the low- <br />est invert of the manhole to the invert of the pipe being served by the drop <br />inlet. <br />24,000.8.K. SPECIAL STRUCTURES 6 APPURTENANCES: Methods of measurement for <br />special structures and appurtenances not included above shall be as stated in <br />14 the "Special Provisions," "Specific Requirements," and "Proposal." <br />24,000.9. BASIS OF PAYMENT: <br />24,000.9.a. TRENCH EXCAVATION 6 BACKF.,.L• Regardless of the width excavated, <br />m+ sower pipe furnished and installed will he paid for at the Contract Unit Price <br />per linear foot of pipe falling within each of the following depth zones: <br />"0 <br />From 0' to 8', from 8' to 10', and two foot increments thereafter. <br />Excavation and backfilling of trench shall be included in the price of sewer <br />ha► pipe furnished and installed. <br />1* <br />24,000.9.B. SOLID ROCK _F.XCIVATION: Solid rock excavation will be paid f,,r at <br />» the Contract Unit Price per cubic yard. <br />r <br />24,000.Q.C. SEWER PIPE IN PLACE: Sewer pipe in each diameter and c.lansifica- <br />tion furnished and installed will be paid for at the Contract Price per linear <br />foot which shall include payment for trench excavation and hackfilli,i)r. <br />24,000.9.D. DUCTILE IRON PIPE.: Ductile iron pipe will he paid for at the <br />Contract unit foot for each 'ype and diarae'ar of pipe fur- <br />nished which xhall include payment for trench excavation and hackf►ll. <br />24,00O,9,F, WYE BRANCHES: Wye branches will he paid for at. the Contract Unit <br />Price for each unit furnieh,.f and installed the size specitied on the Prv- <br />P')441 . <br />2 /84 /4554b <br />Copyright 19R4 <br />1loneottoo, Rosen", Anderlik <br />A Associate$, Inc. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.