Laserfiche WebLink
24,000.6.C. DE, -_...4CY OF BACKFILL, BY WHOM SUPPLIED: Any deficiency in the <br />quantity of material for backfilling the trenches, or for filling depressions <br />caused by settlement, -hall he supplied by the Contractor with no extra com- <br />pensation allowed. Any sr.:lement which occurs shall be refilled by the Con- <br />tractor. Material shall be provided at the Contractor's expense and the matL- <br />rial shall be approved by the Engineer. <br />24,000.6.H. DISPOSAL OF EXCESS MATERIALS AND DEBRIS: Unless otherwise speci- <br />fied, excavated material either not suitable or not required for fill material <br />shall be disrosed of by the ,-,ntractor outside of the right-of-way at his ex- <br />pense in any manner he may -lect subject to the provisions of the following <br />paragraph. <br />Before dumping such materials or debris on a private or public land, the Con- <br />tractor must obtain from the Owner of such land written permission for such <br />dumping and a waiver of all claims against the Owner for any damage to such <br />land which may result therefrom together with all permits required by law for <br />such dumping. A copy of such permission, waiver of claims and permit shall be <br />filed with the Engineer before said disposal is made. <br />24,000.6.I. RESTORATION OF SURFACE: All surfaces disturbed during the con- <br />struction period, whether caused by actual excavation, deposition of excavated <br />material, or by the constr­-1'; rn equipment, shall be returned to its original <br />conditions or better. Ex,pptionr to the above, if any, or special instruc- <br />tions pertaining to any particular section of the project will be outlined in <br />the "Special Provisions." <br />24,000.6.3. CLEANING UP: Surplus pipe line material, tools anel remporary <br />structures shall be removed by the Contractor, and all dirt, rubbish, caused <br />by his operations and excess earth from excavations shall be hauled to a dump <br />provided by the Contractor and the construction site shall he left to the sat- <br />isfaction of the Engineer. <br />Clean up and restoration shall include the replacement and restoration of all <br />street signs, mailboxes, posts, fences and similar items disturbed by the con- <br />struction described herein. Unless otherwise noted in the Special Provisions <br />or Proposal all items of clean -yip and restorations shall he considered inci- <br />dental to the contract with no additional compensation allowed. <br />24,000.7. TESTING PIPE LINES <br />24,00n.7.A. 1NFITIRArION__IN SEWER-: Upon completion of the Newer construc- <br />tion, leakage cest9 shall be made Lo determine the amount of ground water in- <br />filtration into the sewers. Measurements will be made by means of 90° V-notch <br />weirs placed in t►-,e lines. Measurements shall he taken at all points where, <br />in the c-anion of the Engineer, the flow of water in the sewers is greater <br />0.an the iximum allowable leakaF,-. Tests inav he taken between individual <br />manholes ..d the infiltration in any given li hall •,?t tx.ved th. specified <br />maximum allowable race. <br />"he maximum allowable rate cif <br />per inch diameter of pilve per day. <br />ige shall not exceed 'n0 gallons per mile <br />24,000-14 <br />2 84!4554b <br />Copvright 198m <br />llonastruo, Rnoene, Anderlik <br />6 Associptes, Inc. <br />