My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pensation therefore shall be the responsibility of the Contractor. Where tree <br />trimming is required, all cut surfaces one inch or more in diameter shall be <br />covered with a coat of asphalt paint. <br />24,000.3.E15. Interruption of Water Service: Nu valve or other control on <br />the existing system shall be operated for any purpose by the Contractor with- <br />out approval of the Engineer and all consumers affected by such operation <br />shall be notified by the Contractor at least an hour before the operation and <br />advised of the probable time when service will he restored. " <br />24,000.3.E1E. Tunneling, Jacking or Excavation Other Than Open Trench: Where <br />pipe cannot be placed by open trench excavation, the method for placing and <br />payment thereof shall be stated in the "Specific. Requirements". <br />24,000.3.F.17. Manner of Handling Pipe 4 Accessories Into Trench: Proper im- <br />plements, tools and facilities satisfactory to the Engineer shall be provided <br />and used by the Contractor for the safe and convenient prosecution of the work. <br />24,000.3.F,18. Pi E�Ke tClClean: All foreign matter or dirt shall be removed <br />from (tie inside of the pipe before it is lowered into its position in the <br />trench and it shall be kept clean by approved means during and aft,�r laying. <br />All matter entering the pipe shall he removed by the Contractor prior to ac- <br />ceptance th no ad('itional compensation allowed. <br />24,000.3.E19. Laying the Vie: The spigot shalt be lubricated, centered in <br />the dell, the pipe shoved into position and brought into true alignment; it <br />shall he secured there with earth carefully tamped under and on each side of <br />it, excepting at the bell holes. Care shall be taken to prevent dirt from en- <br />tering the joint space. <br />24,000.3.E20. Preventing Trench Water From Entering Pipe: All openings along <br />the line of sewer shall he securely closed, and at the suspension of work at <br />any time, suitable stoppers shall be placed to prevent water, earth or ether <br />substances from entering the sewer. <br />24,000.3.F:. l Ends to Face Direction of laying: Pipe laying shall pro- <br />ceed upgrade iigot ends pointing in the direction of flow. <br />24,000.3.E22. ,ad b Highway Crossing_ When any railroad or highway is <br />crossed, al: p, ionary constriction measures required by the railroad or <br />highway shall he allowed. Railroad or highway crossings shall be paid for as <br />jacking or tunneling and construction and permit requirements shall he as <br />stated in the "Specific Requirements". <br />24,000.3.E23. Unsuitable conditions for Laying Pipe: No pipe shall be laid <br />in water or when the trench conditions are unsuitable for such work. <br />24,(100.3.E24. Jointing: Joints for vitrified clay and concrete pipe shall be <br />made by wiping the 'o:int- -lean, applying the manufacturer's recommended lubri- <br />24 , 000-10 <br />V. <br />2 /84 /4554b <br />copyright lg84 <br />Sonestroo, P.nsene, Anderlik <br />4 Associates, Inc. <br />O. <br />
The URL can be used to link to this page
Your browser does not support the video tag.