My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
After the sod has been placed, the sod shall he pressed into the underlying <br />soil by rrlling or tamping. — <br />2575.3.7. Placing Erosion Mats: Erosion mats shall be installed in <br />accordance wi h Mn DOT Spec met on 2575.3.C. <br />2575.3.A. Maintenance All sued placed under the contract shall he watered <br />and maintained by the contractor until acceptance by the Engineer. <br />Upon being placed, the sod shall he maintained for at least 30 growing days <br />before final acceptance will be made. During the maintenance period, all sod <br />which is presumed dead, damaged, or has become infected with weed= shall he <br />replaced with new sod as directed by the Engineer. <br />When so directed by the Fngineer, the contractor shall reseed anv areas on <br />which the original seed has failed to grow. if mulching is required on the <br />project, the reseeded area shall also be remulched. <br />Until final acceptance of the work, all mair.tcnance and repair work shall be <br />performed at the expense of the contractor, except that the additional seed <br />and mulch material used for reseeding and remulching will he measured and paid <br />for at the contract unit prices. <br />2575.3.9. Acceptance of Work: Seeding will generally be accepted by <br />increment area upon satisfactory complet.on of the feeding and mulching and <br />anchoring if specified. Acceptance of seeding will relieve the contractor of <br />responsibility for maintenance except for reseeding and remulching as directed <br />by the Fngineer. <br />Upon satisfactory placement of the original sod, payment tar sud placed will <br />be authorized At the contract unit price subject to retainage provisions of <br />the Conditions of the Contract. Upon expiration of the sod maintenance <br />period, the contractor shall immediately replace all presumed dead and damaged <br />sod, or sod which has become infected with weeds. Areas replaced with new sod <br />shall have the maintenance period extended by 20 days after replacement. <br />Final payment shall not be made +rntil after the maintenance period or extended <br />period and acceptance by the Engineer. <br />2575.4. METHOD OF MEASUREMEMT: <br />2975.4.1. Sped in&: Seeding will he measured by original area se,.ded. Areas <br />req+tiring reseeding where the original seed has tailed to grow will not be <br />added to the original measured area. <br />2575.4.2. Seed: All seed furnished and applied for both the original seeding <br />and reseeding shall he measured by the weight nt each mixhire used. <br />357R,4.1. Mulch: Mulch materials will he measured svparat ely by weight of <br />each type f�rniehpd and acceptshly applied mulch material us-•d in remulching <br />will he measured by weight and Adfled to the m++lch +1,.+antitiem r+ttt.i.n.illy used. <br />S/H4-.h7Na <br />ropvright 1044 <br />Roneatroo, Rosene. Anderlik <br />: Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.