Laserfiche WebLink
ro <br />!P <br />2575.3.3. Applying Fertilizer: Fertilizer shall be Commercial Grade 12-12-12 <br />applied at the rate of 200 pounds per acre unless otherwise specified in the <br />�r Specific Regt.ii.rements using mechanical spreading devices which provide uniform <br />distribution of the material over the designated areas. <br />2575.3.4. Sowing Seed: Seeding shall be done as soon as possible after <br />�4 finish grading has been completed. <br />A The rate of application and season of planting shall be as follows: <br />1g <br />Mixture Pounds Per Acre Season of Planting <br />5 50 April 1 - Sept. 15 <br />7 70 April 1 - Sept. 15 <br />F <br />H. <br />The seeding date restrictions may be modified and dormant seeding will. be <br />allowed subject to the approval of the Engineer. <br />Seed shall be sown by means of mechanical or hydro spreading of the seeds at <br />the specified rate of application. An agricultural type seed drill will be <br />required only where mulching is not specified. <br />2575.3.5. dying Mulch: The rate of application of Type I mulch shall be <br />approximately two (2) tons per acre. The mulch shall be anchored with a disc, <br />clodbuster or other approved equipment. This equipment shall anchor the <br />material by punching it into the soil to a depth of approximately 2 to 3 <br />inches. The anchoring equipment shall be operated in a general direction at <br />right angle to the direction of surface drainage wherever practical. All <br />mulch shall be anchored the same day as it is placed. <br />Applying other types of mulch material shall he in accordance with Mn/DOT <br />Specification 2575.3E. <br />2575.3.6. Placing Sod. All sod shall be placed within 24 hours after being <br />cut. During this period, it shall be protected against drying out by being <br />covered as may be necessary. The sod strips shall be carefully placed by <br />hand, beginning at the bottom of the slope and progressing upward. The length <br />of the strips on slopes shall he as nearly as practical at right angles to the <br />slope. The strips shall be laid with staggered joints and the edges of all <br />strips shall be tightly pressed against the edges of adjoining strips. Sod <br />laid adjacent to existing turf shall he neatly butted to the existing turf <br />with no overlapping allowed. <br />Overlapping of sod strips, shingle 9tyle will be required in waterways where <br />directed by the Engineer, in which case the sod strip shall be laic! at right <br />angles to the flow of water. <br />Although pegging of sod is not specifically required, it is understood that <br />the contractor will be responsible for the successful establishment of the sod <br />including repair or replacement of sod which becomes displaced or damaged due <br />to the lack of protection. <br />8 /84-6 2'Aa <br />Copvright 19k <br />Ronestroo, Romonr, Anderlik <br />b Associates, Inc. <br />