My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 2 211 . AGGREGATE HASP. <br />Specific Reluirements <br />2211.0. SPECIFICATION REFERENCE: Unless otherwise noted or modified herein, <br />all sections of Ceneral Requirements shall apply. <br />2211.2.1. AGGREGATE. Aggregate material used for this project shall be in <br />accordance w tl h MST Specific 2211 for Class 5 gravel base (100% rushed). <br />2711.3. CONSTRUCTION REQUIREMENTS: The subgrade shall he insprcte.i, checked, <br />and approved by the Engineer prior to placement of aggregate base. <br />The aggregate base shall bf, compacted by the method called "specified density" <br />to LOOT standard density. <br />Aggregate base shall ho shaped to a tolerance of 1/4 inch, of the design grade <br />And crown. <br />?211.3.1. GENERAL: Where water is required for work outlined herein, it <br />shall bt, furnished by tho contractor. <br />The contractor shall water the aggregate placed on this project for dust con- <br />trol as directed by the Fufineer. No direct payment will be made for dust <br />control or water used for the project work. <br />F++s 2211.4. METHOD OF MEASUREMENT: Aggregate base used on this project shall be <br />measured by weight in tons only of material deposited on the ro.idwav as <br />required by the standard cross-section shown on the plans. <br />».. <br />VIS <br />. <br />to <br />Where, in the opinion of the Engineer, aggregate base is being wasted or used <br />excessively, deductions in the quantity of base for payment purposeF will e <br />made on the basis of 110 pounds per square vard inch of thickness. <br />'211.5. BASIS OF PAYMENT: Pavment for aggregate base shall he by the ton <br />compacted inplace. Aggregate base, as listed on the. Proposal shall include <br />All material required for drivewav repair and'or regrading. <br />Where settlements or depressions occur in the aggregate base resulting from <br />trench settlement, the contractor shall place additional aggregate 'lase with- <br />out further compensation therefor. <br />n-5R41c <br />fopyright 1985 <br />Ronestroo, Rosene, Anderlik <br />b Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.