My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 894
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0800 - 0899 (June 27, 1977 April 13, 1978)
>
Resolution 894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 3:12:21 PM
Creation date
11/13/2015 3:12:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />t <br />SECTION <br />6: DRAINFIELDS OR SOIL TREATMENT AREA <br />I A. Location ' <br />1. <br />On slopes in excess of 12 percent the soil profile <br />shall be carefully evaluated in the location of the <br />` <br />proposed soil treatment area and downslope to identify <br />_ <br />the presence of layers that may cause sidehill seepage. <br />In no case shall. a trench be located within 15 feet of <br />such a layer surfacing on the downslope. <br />2. <br />Bed construction shall be limited to areas having <br />I <br />natural slopes of less than six percent. <br />(� B. Design <br />and Construction <br />- 1. <br />The bottom of trenches and beds shall be at least four ' <br />feet above the watertable or bedrock. <br />2. <br />The trenches shall be not less than 18 inches nor more <br />fthan <br />36 inches wide. Any trench wider than 36 inches <br />shall.be considered a bed. <br />[; 3. <br />Trenches and beds shall be. not more than 100 feet in <br />length. <br />4. <br />The bottom of the trench or bed excavation shall be <br />level. <br />[, 5. <br />The bottom and sides of the trench or bed excavation <br />to the level of the filter material shall be scarified <br />_ <br />to remove smears left by the construction equipment and <br />_ <br />footprints. All loose material shall be removed from <br />.the excavation. The bottom of the excavation shall not - <br />be driven on after scarification. <br />6. <br />When the soil percolation rate at the bottom of the <br />trench or bed is slower than 15 minutes per inch, no <br />vehicle or .excavator shall be allowed to drive on after <br />scarification. <br />7. <br />There shall'be a layer of at least six but no more than <br />.24 inches of filter material in the bottom.of the <br />trenches and beds. <br />'. 8. <br />Where disposal trenches are constructed*within ten feet <br />of trees six inches or larger in diameter, or dense <br />shrubbery, or where it -can reasonably be anticipated <br />that such vegetation will be present 'during the <br />expected life of the system, at least 12 inches of <br />filter material shall be placed beneath the distribution <br />pipe. <br />=37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.