My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 894
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0800 - 0899 (June 27, 1977 April 13, 1978)
>
Resolution 894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 3:12:21 PM
Creation date
11/13/2015 3:12:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e <br />-23' . <br />1• <br />• <br />, <br />SECTION 2: BUILDING SEWERS <br />1. <br />The building sewer, and all piping to the point where <br />the disposal field begins, shall be of water tight <br />piping and joints. Joints between this piping and <br />other appurtenances of the system shall be water tight. <br />-The use of perforated pipe or its equivalent is prohibited. <br />2. <br />No building drain or building sewer shall be less than <br />four inches in diameter. <br />3. <br />The buried or concealed portion of any building sewer, <br />building drain or branch thereof shall be located at <br />least 20 feet from any well shall be constructed of <br />cast iron pipe with air tested joints. The air test <br />should be made by attaching an air compressor or test <br />apparatus to a suitable opening and closing all other <br />inlets or outlets to the sewer and/or drain under test <br />by means -of -prop;er --testing-plugs;—Air- -shall be forced <br />Into the system until there is uniform pressure of five <br />pounds per square inch in the section being tested. <br />The system'shall be considered satisfactorily air <br />tested'if the pressure therein remains constant for 15 <br />minutes without the addition of air. - <br />• <br />4:' <br />The portions of any buried sewer more than 50 feet from <br />a well shall be *constructed of cast-iron, vitrified <br />clay, cement -asbestos, concrete or other City approved <br />pipe material. <br />5. <br />All joints between -pipes and fittings in the building <br />sewer shall have water tight and root tight joints and <br />' <br />shall be air . tested.- Portland cement mortar joints <br />" <br />shall not be allowed. 'mines shall provide a.grade of <br />not less than one-eighth inch per foot. All changes. of <br />grade shall be by means of long sweep ells. Where -long <br />sweep ells are not used and where the direction changes <br />by more than 22-1/2 degrees, accessible cleanouts shall <br />be provided. <br />-23' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.